当前位置:主页 > 科技论文 > 交通工程论文 >

自锚式悬索桥体系转换过程的无应力状态控制法

发布时间:2018-03-06 15:26

  本文选题:自锚式悬索桥 切入点:吊索张拉 出处:《重庆交通大学学报(自然科学版)》2014年01期  论文类型:期刊论文


【摘要】:以满足自锚式悬索桥目标成桥状态为前提,针对如何确定自锚式悬索桥体系转换过程中吊索张拉力及张拉程序的问题,提出了自锚式悬索桥体系转换过程的吊索张拉计算方法:调整吊索无应力长度的降温法。由于倒退分析法和传统无应力状态控制法在计算自锚式悬索桥体系转换过程中存在缺陷,在传统无应力状态控制法的基础上,提出了调整吊索无应力长度的降温法。该方法可用于计算自锚式悬索桥且计算方法简单,计算精度高。
[Abstract]:On the premise of satisfying the target state of self-anchored suspension bridge, how to determine the tension of the sling and the stretching program during the system transformation of the self-anchored suspension bridge is discussed. In this paper, the method of sling tension calculation in the process of system transformation of self-anchored suspension bridge is put forward: the cooling method of adjusting the length of sling without stress. The system conversion of self-anchored suspension bridge is calculated by retrogressive analysis method and traditional no-stress state control method. There are defects in the process, Based on the traditional stress-free state control method, a cooling method for adjusting the unstressed length of sling is proposed, which can be used to calculate self-anchored suspension bridge with simple calculation method and high accuracy.
【作者单位】: 重庆交通大学土木建筑学院;
【基金】:交通运输行业联合科技攻关项目(2010-353-341-230)
【分类号】:U448.25

【参考文献】

相关期刊论文 前3条

1 秦顺全;斜拉桥安装无应力状态控制法[J];桥梁建设;2003年02期

2 秦顺全;;分阶段施工桥梁的无应力状态控制法[J];桥梁建设;2008年01期

3 沈锐利;悬索桥主缆系统设计及架设计算方法研究[J];土木工程学报;1996年02期

【共引文献】

相关期刊论文 前10条

1 唐茂林,强士中,沈锐利,李平利;悬索桥主缆线形设计与施工计算原理及其Win32软件开发[J];重庆交通学院学报;2003年02期

2 孙玉平;沈锐利;唐茂林;吴i,

本文编号:1575402


资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/jiaotonggongchenglunwen/1575402.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户7e657***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com