江津中渡长江大桥南锚碇沉井施工技术

发布时间:2018-06-20 08:28

  本文选题:桥梁工程 + 悬索桥 ; 参考:《施工技术》2016年24期


【摘要】:江津中渡长江大桥南岸重力式锚碇沉井位于建筑物集中区,沉井平面尺寸为58.3m×45.8m,下沉23.5m,需要穿越9~12m砂卵石层,为西南地区首个大型沉井,施工难度很大。经过精确模拟计算,沉井施工采用钻孔灌注防护桩的方式确保周边建筑物的安全,同时减小了井壁侧摩阻力,利用砂套与空气幕作为下沉辅助措施,最终沉井顺利下沉到位,同时创新地采用"挖掘机+门式起重机+履带式起重机"组合机械出土方式,提高了施工效率。通过实时监测并及时调整的技术确保了沉井下沉的平稳进行。
[Abstract]:The gravity Anchorage caisson on the south bank of Jiang Jin Zhongdu Yangtze River Bridge is located in the concentrated area of buildings. The plane size of the caisson is 58.3 m 脳 45.8 m, and the sinking is 23.5m. the caisson needs to cross 912m sand and pebble bed, and it is the first large caisson in southwest China, which is very difficult to construct. Through the accurate simulation calculation, the caisson construction adopts the way of bored cast-in-place protective pile to ensure the safety of the surrounding buildings, at the same time, it reduces the friction on the sidewall of the shaft, and uses the sand sleeve and air curtain as the auxiliary measures of sinking, finally, the caisson goes into place smoothly. At the same time, the excavator gantry crane and crawler crane are used to unearth the excavator and the construction efficiency is improved. The technique of real-time monitoring and timely adjustment ensures the steady sinking of the caisson.
【作者单位】: 中建六局桥梁有限公司;
【基金】:中建股份科技研发课题(CSCEC-2012-Z-22)
【分类号】:U445.557

【相似文献】

相关期刊论文 前10条

1 李家平,张子新,黄宏伟,李永盛;宁波庆丰大桥锚碇室内相似模型试验研究[J];同济大学学报(自然科学版);2005年08期

2 王宗仁,王崇旭,庄值政,谢明;四渡河桥隧道式锚碇开挖支护工艺[J];施工技术;2005年S1期

3 刘子振;王长征;言志信;;桩台式锚碇设计优化及应用[J];森林工程;2006年03期

4 张少军;;阳逻长江公路大桥南锚碇基础工程建设关键技术[J];世界桥梁;2006年02期

5 廖新;;大体积锚碇开挖施工探讨[J];科技咨询导报;2007年28期

6 白雪o,

本文编号:2043655


资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/jiaotonggongchenglunwen/2043655.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户f0c89***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com