夏季高原干旱地区铁路桥墩大体积混凝土防裂技术研究
[Abstract]:In the northwest plateau, the climate is dry, the temperature difference between day and night is large, the seasonal characteristic is obvious, the temperature field and stress field of mass concrete are influenced by environmental factors, and the research on mass concrete of bridge pier is relatively few at present. The existing construction methods and experience can not be fully applied to the northwest plateau environment. With the overall construction of high-speed railway in Northwest China, a large number of mass concrete piers and foundations appear in the construction of railway bridges. However, cracks will appear in the construction and service of mass concrete structures. This is an indisputable fact, therefore, how to take effective construction methods and maintenance measures to reduce the occurrence of these harmful cracks is an urgent problem to be solved. In this paper, the temperature field and thermal stress of concrete during the construction and maintenance of bridge pier are analyzed by using the finite element analysis software Midas / FEA, based on the mass concrete project of Xining super bridge pier on the second line of Qinghai-Tibet Railway. Based on some sensitive parameters which affect the temperature field and thermal stress of mass concrete, the crack prevention technology of railway pier mass concrete construction in arid area of plateau in summer is discussed. The main research contents are as follows: (1) summarize and study the theoretical knowledge of temperature field and stress field of mass concrete, introduce the method of selecting thermodynamic parameters of concrete, mainly include the thermal conductivity of concrete. Temperature conductivity coefficient, convection coefficient, heat source function, etc. (2) temperature field and temperature stress of concrete of 28 # bridge pier constructed in summer are simulated and analyzed by midas / FEA, and the time history curve of temperature and stress of pier concrete is given. The temperature control indexes stipulated in "Technical Specification for Mass concrete Construction" (GB50496-2009) are analyzed in detail, including the peak temperature rise of concrete, the temperature difference on the inside surface, and the temperature difference between the surface layer of concrete and the ambient temperature. (3) consolidation and analysis of field experimental data, summing up the temperature rise curve of mass concrete in summer. At the same time, based on the field measured data, the temperature field is estimated by using the traditional empirical formula. Finally, the reliability and validity of MIDAS-FEA simulation analysis are verified by comparing the estimated values, finite element results and measured results. (4) some sensitive factors affecting the temperature field and thermal stress of mass concrete are discussed. Focusing on the characteristics of the construction in the arid area of the plateau in summer, this paper studies the crack prevention technical measures suitable for mass concrete construction of the railway pier in the arid area of the plateau in summer.
【学位授予单位】:兰州交通大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:U445.57
【相似文献】
相关期刊论文 前10条
1 向超;高温沙漠地区大体积混凝土施工[J];建筑技术;2000年01期
2 席亚煜,刘爱武,谢开嫣;山西国际贸易中心工程大体积混凝土施工[J];建筑技术;2000年01期
3 曹力,刘京京,黄敏虎;大体积混凝土施工中的温度控制[J];北京水利;2000年05期
4 王勇;浅谈大体积混凝土施工中温度控制[J];当代建设;2000年05期
5 迟培云,杨旭,李金波;大体积混凝土的冬季冷法施工技术[J];低温建筑技术;2000年03期
6 崔庆怡,李西海,贾忠奎;高强粉煤灰大体积混凝土施工技术的探讨[J];粉煤灰;2000年06期
7 于航;加强施工管理,控制大体积混凝土裂缝产生[J];建筑管理现代化;2000年02期
8 孙波,杨锁青;津津花园工程大体积混凝土施工技术[J];建筑技术开发;2000年06期
9 李建林,刘伟杰,杨志颖;大体积混凝土施工[J];水利天地;2000年04期
10 麻建锁,刘艳萍;80,000t立筒库基础大体积混凝土质量控制[J];河北建筑工程学院学报;2000年03期
相关会议论文 前10条
1 王咏梅;夏利娟;;基础大体积混凝土的裂缝预控[A];土木建筑学术文库(第14卷)[C];2010年
2 徐晓东;谭晓恒;;大体积混凝土测温控制及蓄热养护调整措施[A];土木建筑学术文库(第14卷)[C];2010年
3 陈刚毅;;大体积混凝土施工要点[A];河南省土木建筑学会2010年学术大会论文集[C];2010年
4 张云辉;王晓耀;;浅谈大体积混凝土测温控制及蓄热养护调整措施[A];河南省土木建筑学会2010年学术研讨会论文集[C];2010年
5 韦宏深;;大体积混凝土质量通病的防治[A];河南省建筑业行业优秀论文集(2006)[C];2006年
6 李军干;王东星;高海军;;大体积混凝土裂缝产生的原因及应对措施[A];河南省建筑业行业优秀论文集(2007)[C];2007年
7 李四化;;论大体积混凝土施工[A];河南省土木建筑学会2008年学术交流会论文集[C];2008年
8 郭亚莉;张磊;罗文;;论大体积混凝土防裂缝施工技术[A];河南省建筑业行业优秀论文集(2008)[C];2008年
9 赵凯瑞;刘培贤;;大体积混凝土的施工质量控制[A];河南省建筑业行业优秀论文集(2010)[C];2010年
10 张毅科;周耀旭;李永庆;黄文君;何云;曹宝;黑金龙;;大体积混凝土的配合比设计和温度控制[A];全国混凝土新技术、新标准及工程应用——“全国混凝土新技术、新标准及工程应用”学术交流会暨混凝土质量委员会和建筑材料测试技术委员会2010年年会论文集[C];2010年
相关重要报纸文章 前10条
1 新疆油田公司采油二厂工艺研究所 尹建江 新疆克拉玛依石油局设计院监理公司 王宗昌 尹金生;预拌混凝土质量问题及大体积混凝土施工控制(下)[N];中国建材报;2007年
2 山西潞安工程有限公司 杨勇;浅析控制大体积混凝土裂缝的措施[N];科学导报;2010年
3 王林波 陈建江 博乐市九洲建筑安装有限责任公司;论建筑施工中的大体积混凝土浇筑技术[N];博尔塔拉报;2008年
4 韩利兵;大体积混凝土施工技术研究[N];晋中日报;2012年
5 浙江绍兴 冯春华 顾素玲 陈迪伟;高层建筑承台大体积混凝土施工[N];建筑时报;2013年
6 水电顾问集团 常作维;大体积混凝土的温度控制[N];中国能源报;2013年
7 裘宝华;大体积混凝土施工中温度裂缝的分析和预防控制[N];建筑时报;2006年
8 闻慧英;大体积混凝土裂缝产生与预控[N];建筑时报;2007年
9 浙江华鹏建设集团有限公司 孟文斌邋钱国明;大体积混凝土施工中的裂缝防治[N];建筑时报;2007年
10 山西焦煤西山煤电集团公司 刘鸿;试论大体积混凝土裂缝的成因与控制方法[N];山西科技报;2010年
相关博士学位论文 前6条
1 李潘武;大体积混凝土非荷载应力的施工系统控制[D];西安建筑科技大学;2004年
2 杨和礼;原材料对基础大体积混凝土裂缝的影响与控制[D];武汉大学;2004年
3 张宇鑫;大体积混凝土温度应力仿真分析与反分析[D];大连理工大学;2002年
4 张晓飞;大体积混凝土结构温度场和应力场仿真计算研究[D];西安理工大学;2009年
5 宫经伟;水工准大体积混凝土分布式光纤温度监测与智能反馈研究[D];武汉大学;2013年
6 刘西军;大体积混凝土温度场温度应力仿真分析[D];浙江大学;2005年
相关硕士学位论文 前10条
1 郭全意;基于应力场的大体积混凝土早期裂缝监控与预测[D];兰州理工大学;2011年
2 张振德;大体积混凝土温度发展规律和配比优化研究[D];山东科技大学;2005年
3 李秀才;大体积混凝土开裂机理与仿真研究[D];武汉理工大学;2003年
4 王东;施工期大体积混凝土温度场与应力场有限元分析[D];新疆农业大学;2011年
5 吕寅;低温升抗裂大体积混凝土研究与应用[D];武汉理工大学;2012年
6 梁嘉彬;高原环境下冬季大体积混凝土防裂技术研究[D];兰州交通大学;2012年
7 吴华君;大体积混凝土结构裂缝控制措施研究[D];浙江工业大学;2011年
8 姜伟思;阜新恒盛国际基础大体积混凝土温度场实测与分析[D];辽宁工程技术大学;2012年
9 许丽佳;预应力大体积混凝土梁不同龄期承载能力评价[D];东北石油大学;2013年
10 余江平;某办公大楼基础大体积混凝土施工技术研究与应用[D];南昌大学;2013年
本文编号:2120069
本文链接:https://www.wllwen.com/kejilunwen/jiaotonggongchenglunwen/2120069.html