斜塔斜拉桥的塔梁同步施工方法研究

发布时间:2018-07-23 12:17
【摘要】:本文围绕讨论塔梁同步施工方法是否可以应用于斜塔斜拉桥这一主线,,以福建光泽县桔子洲大桥主桥为研究背景,主要从以下三个方面开展了研究工作: 1)先简单介绍了本文依托工程的有关概况,采用有限元软件MIDAS/Civil建立结构在成桥状态下的模拟模型,并分别按照先塔后梁和塔梁同步两种施工方法的施工流程在软件中添加施工信息并进行正装计算。 2)比对结构分别采用先塔后梁和塔梁同步法进行施工的计算结果,从结构在施工阶段和运营阶段两个方面分析塔梁同步施工法对结构各主要构件的影响,再结合两种施工方法的优缺点,论述塔梁同步施工法的可行性。 3)在研究塔梁同步施工法对结构的影响时,由于斜拉索索力对结构受力具有关键作用,本文将此部分独立为一章。该部分用正装法确定了以设计成桥索力为目标的施工索力,并用正装迭代法确定了以施工索力为目标的斜拉索单元初始张拉力,然后分析了塔梁同步施工法对索力的影响,并对采用塔梁同步施工法进行施工的依托工程索力施工控制结果进行了分析,并依据此结果对塔梁同步法实际应用的效果进行验证。
[Abstract]:This paper discusses whether the synchronous construction method of tower and beam can be applied to the main line of inclined tower cable-stayed bridge, taking the main bridge of Kuangze County, Fujian Province as the research background. The main research work is as follows: 1) this paper introduces the general situation of the project and establishes the simulation model of the structure under the condition of the bridge by using the finite element software MIDAS/Civil. According to the construction flow of the first tower and the back beam and the tower beam synchronously, the construction information is added to the software and the normal installation calculation is carried out. 2) the calculation results of the construction of the structure using the first tower and the rear beam and the tower beam synchronously are compared. This paper analyzes the influence of the tower and beam synchronous construction method on the main components of the structure from two aspects: the construction stage and the operation stage, and then combines the advantages and disadvantages of the two construction methods. The feasibility of tower beam synchronous construction method is discussed. 3) in studying the influence of tower beam synchronous construction method on the structure, because the cable force plays a key role in the structure force, this part is divided into a chapter. In this part, the construction cable force with the design of the bridge cable force as the target is determined by the formal loading method, and the initial tensioning force of the cable-stayed element with the construction cable force as the target is determined by the formal installation iteration method, and then the influence of the tower beam synchronous construction method on the cable force is analyzed. The control results of cable force construction based on tower beam synchronous construction method are analyzed, and the practical application effect of tower beam synchronization method is verified.
【学位授予单位】:武汉理工大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:U448.27

【参考文献】

相关期刊论文 前10条

1 段波,曾德荣,卢江;关于斜拉桥索力测定的分析[J];重庆交通学院学报;2005年04期

2 徐强;杨威;蒋敏杰;;绥芬河斜拉桥塔梁同步施工控制技术的研究[J];城市道桥与防洪;2007年11期

3 魏建东,刘山洪;基于拉索静态线形的索力测定[J];工程力学;2003年03期

4 许建得;李钦;霍永生;;惠州合生大桥塔梁同步施工监控技术[J];广东土木与建筑;2010年04期

5 孙全胜;孙永存;;斜拉桥塔梁同步施工与控制技术的研究[J];公路;2007年04期

6 张拥军;蒋卫东;;超宽斜拉桥塔梁同步施工方案与控制技术[J];公路交通科技(应用技术版);2009年05期

7 胡跃;陈勇;;贵溪大桥独斜塔无背索斜拉桥塔梁同步施工技术[J];城市道桥与防洪;2012年09期

8 黄侨,吴红林,李志波;确定斜拉桥施工索力的正装计算法[J];哈尔滨工业大学学报;2004年12期

9 侯俊明,彭晓彬,叶方才;斜拉索索力的温度敏感性[J];长安大学学报(自然科学版);2002年04期

10 熊邵辉;卓静;;斜拉桥塔梁同步施工可行性研究与施工控制[J];公路与汽运;2010年01期



本文编号:2139392

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/jiaotonggongchenglunwen/2139392.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户e64c6***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com