忠万高速公路A8项目施工进度管理研究
[Abstract]:In recent years, with the development of social economy and the improvement of people's living standards, the demand for expressways has become more and more large, and the construction of highway projects has been developed rapidly. At the same time, the uncertain factors of the highway construction are more and more, and the relationship between the various factors is becoming more and more complex, Therefore, the construction of the project is more difficult. Therefore, it is necessary to manage the construction of the whole project. The highway project is a large investment, a long period of construction and many projects involving a large number of units. There are many factors affecting the construction progress. At this time, it is necessary to manage the progress of the project, allocate reasonable resources and coordinate the construction of the project. The project management is a complex process. It is necessary to use scientific methods to compile the project construction schedule and put it into practice. In the construction process of the project, it is necessary to track whether the actual progress of the project is carried out according to the original plan, if inconsistent, It is necessary to analyze the reasons for the existence of the deviation and adjust the original schedule to the completion of the project. On the basis of a large number of documents about the project construction progress management at home and abroad, this paper defines the concept of the project construction progress management, analyzes the characteristics of the construction progress management of the highway project, and probes into the human and technical skills. The influence of factors such as operation, engineering material and equipment, cost, natural environment and social environment on the management of construction progress target of expressway project. After that, the present situation of construction management of the A8 project of Zhong Wan expressway is introduced, the management goal of the project construction progress is clarified, and the specific situation of the construction progress plan and implementation of the project is analyzed. After the situation, the corresponding project construction schedule management control and guarantee measures are put forward to ensure the construction project can be completed successfully. To a certain extent, it provides some suggestions for the construction progress management of the expressway project.
【学位授予单位】:长沙理工大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:U415.1
【相似文献】
相关期刊论文 前10条
1 肖振勇;;浅述项目施工进度管理[J];广东交通职业技术学院学报;2007年03期
2 王洪涛;;实验快堆项目施工进度管理的实践与探讨[J];石油化工建设;2007年06期
3 曾飞翔;;浅谈施工进度管理[J];今日南国(理论创新版);2009年09期
4 孙爱民;李雨;李超;崔谦;;浅析医院工程施工进度管理[J];中国医院建筑与装备;2010年11期
5 王森;;浅谈公路工程的施工进度管理[J];才智;2011年10期
6 杜文刚;;浅析项目施工进度管理[J];中国科技信息;2011年12期
7 胡华强;胡传根;张林法;;建筑工程施工进度管理探析[J];科技风;2011年22期
8 刘步通;;论工程施工的施工进度管理[J];现代商贸工业;2012年03期
9 潘依群;;浅论建筑工程施工进度管理[J];中国新技术新产品;2012年07期
10 张红中;;建筑工程施工进度管理浅析[J];门窗;2012年06期
相关会议论文 前1条
1 李洲华;;建筑工程项目施工的进度管理探讨[A];2013年7月建筑科技与管理学术交流会论文集[C];2013年
相关重要报纸文章 前6条
1 孟文斌;建筑工程施工进度管理之我谈[N];建筑时报;2007年
2 周安才 蒋晓萍;石武客专铁路项目部的经理们(二)[N];经理日报;2009年
3 本报记者 陈果 特约记者 丁智君;以科学发展观加强施工进度管理[N];广东建设报;2009年
4 张岚;青川交通重点建设项目力争60天完成年度目标任务[N];广元日报;2011年
5 周安才 蒋晓萍;驰骋在将军故里[N];中国铁道建筑报;2009年
6 韩立宏;为了庄严的承诺[N];中国铁道建筑报;2006年
,本文编号:2161306
本文链接:https://www.wllwen.com/kejilunwen/jiaotonggongchenglunwen/2161306.html