矿山法隧道粉细砂层大直径孤石处理技术
[Abstract]:It is very easy to collapse in fine silt layer of mine tunnel when disturbed. Taking advanced reinforcement measures can effectively solve the occurrence of landslide accident, but if the silty sand layer is doped with large diameter solitary stone, it is easy to collapse if it is not handled well. In view of the large diameter solitary stone in the fine sand layer of the tunneling tunnel, the collapse accident can be well controlled by adopting technical measures such as temporary shotcrete closed excavating surface and dense steel grille, etc. All monitoring indicators are in line with the design drawings and specifications.
【作者单位】: 中国铁建十六局集团地铁工程有限公司;
【分类号】:U455.4
【参考文献】
相关期刊论文 前3条
1 赵超;彭小林;;电力隧道施工中孤石处理技术[J];广东土木与建筑;2012年10期
2 陈利杰;;含孤石软弱围岩浅埋隧道施工方法[J];隧道建设;2009年04期
3 张维;;大粒径卵石漂石地层大断面暗挖隧道初期支护施工质量控制[J];市政技术;2011年S1期
【二级参考文献】
相关期刊论文 前3条
1 张永波,张云,陈戈,殷密英;花岗岩残积土工程类型划分体系研究[J];地球学报;1997年02期
2 顾宝和;曲永新;彭涛;;劣质岩(问题岩)的类型及其工程特性[J];工程勘察;2006年01期
3 刘好正;风化花岗岩工程特性与路基工程[J];路基工程;2003年05期
【相似文献】
相关期刊论文 前10条
1 刘康;李文武;;静态爆破在大型孤石群中的应用[J];科技与企业;2012年17期
2 党如姣;;孤石的物探探测方法[J];隧道建设;2012年S2期
3 付冬平;;广州北部孤石的特征及其工程特性[J];广东土木与建筑;2009年06期
4 王萍;;隧道孤石群预处理方案研究[J];低温建筑技术;2014年06期
5 谭建峰;;顶管施工中大孤石的处理方法[J];中国科技信息;2007年10期
6 李乾;;地铁盾构法隧道孤石工程分类及处理对策[J];都市快轨交通;2012年01期
7 彭俊骥;;潘桥隧道孤石滑移分析及综合处治[J];建设科技;2013年02期
8 胡建国;水下炸礁和清除大孤石的爆破方法[J];陕西水力发电;1998年03期
9 黄兴华;孤石出露地基的处理[J];广西城镇建设;2004年06期
10 王刚耀,李新;花岗岩孤石的处理[J];西部探矿工程;2005年03期
相关会议论文 前3条
1 徐佩芬;凌苏群;侍文;郭慧丽;;二维微动剖面技术探测“孤石”[A];中国地球物理学会第二十七届年会论文集[C];2011年
2 游永锋;梁奎生;;盾构法施工海底隧道孤石及基岩侵入体爆破施工风险分析[A];2012年中铁隧道集团低碳环保优质工程修建技术专题交流会论文集[C];2012年
3 林梁;;浅析静载法确定遇孤石基桩竖向承载力存在的问题[A];岩石力学新进展与西部开发中的岩土工程问题——中国岩石力学与工程学会第七次学术大会论文集[C];2002年
相关重要报纸文章 前4条
1 本报记者 荣方;“驻村促发展是分内事”[N];威海日报;2011年
2 牛英;大坟山上斗“顽”记[N];科技日报;2000年
3 记者 耿旭静 通讯员 张干劲 朱昊瓴 魏娜;压气作业开创国内施工先例[N];广州日报;2006年
4 本报记者 邓新灵 通讯员 常青 黄辉 石战利 谌文锋 沈昀;盾构机受阻 人工桩顶上[N];广东建设报;2009年
,本文编号:2246671
本文链接:https://www.wllwen.com/kejilunwen/jiaotonggongchenglunwen/2246671.html