港珠澳大桥CB04标段131号墩台吊装结构设计及分析
[Abstract]:Modular hoisting of prefabricated parts (whole piers) in CB04 section of Hong Kong-Zhuhai-Macao Bridge is a key link in the construction of Hong Kong-Zhuhai-Macao Bridge. The operation is more difficult, the environment is dangerous and complex, and the engineering precision is required. The pier and abutment are reinforced concrete structure with a total weight of 2044 tons. In view of the large self-weight of the lifting parts and the complicated working environment of the lifting, in order to ensure the safety, reliability, accuracy and stability of the lifting process of the whole pier module, This paper designs a set of safe and feasible complex hoisting system, including the hanger, the upper hanger, the lower hanger and the hanger, and so on. The steel box girder structure has the advantages of high bending and torsion resistance, high stability, high fatigue resistance, high lifting capacity, low deflection and deformation, taking into account such factors as feasibility, economy and construction environment, etc. The steel box girder structure is finally selected for the pier and abutment hoisting hanger. It is also very important for the material selection of hanger members. Q420B low alloy steel and Q345B low alloy steel are used for the main parts of the steel box girder type hoisting member, such as the cover plate and the outer web, while the secondary material such as the reinforcement plate, the partition and the sealing plate are used as the Q345B low alloy steel. The connecting shaft and high strength bolt are made of 40Cr material. According to different lifting weight and other factors, the cable used in pier and abutment hoisting is selected as high-performance joint-free rope. In this paper, the structure design, three-dimensional modeling, finite element stress-strain analysis and reliability analysis of the whole structure of the lifting crane are carried out by using HyperMesh,Ansys and other software, combined with the design scheme of the crane on the pier and abutment. According to the analysis structure, the hanger structure is further optimized and improved, the final scheme is obtained, and the hoisting technological process is worked out according to the result of the analysis of the hanger. The results show that the first-order buckling coefficient is 27.334, the second-order buckling coefficient is 29.451 and the third-order buckling coefficient is 40.984. The stability of the suspension structure is good and meets the engineering requirements. The stress and strain values of the hanger structure are within the allowable range of the material, so the strength and stiffness of the suspension structure meet the engineering requirements. The research in this paper provides technical guarantee for modular hoisting safety and safe operation of prefabricated parts (whole pier) of CB04 section of Hong Kong-Zhuhai-Macao Bridge, at the same time, it can improve the efficiency and accuracy of the hoisting process of large-scale components. Safety and predictability of behavior are of great significance.
【学位授予单位】:大连交通大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:U445.559
【相似文献】
相关期刊论文 前10条
1 晟华;;港珠澳大桥年内将启动招标[J];筑路机械与施工机械化;2008年03期
2 ;港珠澳大桥三方投资比例确定[J];公路;2008年03期
3 ;总投资422亿的港珠澳大桥已进入地质勘探阶段[J];新经济杂志;2008年03期
4 ;港珠澳大桥外业勘察通过验收[J];中外公路;2008年03期
5 ;港珠澳大桥有望年内开工[J];城市道桥与防洪;2009年02期
6 ;港珠澳大桥有望2009年底开工[J];施工技术;2009年03期
7 ;港珠澳大桥关键技术项目列入国家科技支撑计划[J];商品混凝土;2010年07期
8 ;港珠澳大桥关键技术项目列入国家科技支撑计划[J];中外公路;2010年04期
9 温建华;;港珠澳大桥岛隧工程动工仪式举行[J];中国港湾建设;2011年01期
10 ;港珠澳大桥建设施工示意总图(一)[J];珠江水运;2012年19期
相关会议论文 前10条
1 ;港珠澳大桥终于通过论证确定[A];中国物流与采购联合会会员通讯总第33期-52期(2003年2月-12月)[C];2003年
2 柴建峰;陈晓东;孟凡超;程新生;孙连合;羊小云;李友龙;李学文;万仁凯;;港珠澳大桥主体工程初勘工作介绍[A];2010年全国工程地质学术年会暨“工程地质与海西建设”学术大会论文集[C];2010年
3 张东斌;;港珠澳大桥岛隧工程钢筋自动化加工技术[A];中国建筑学会建筑施工分会、中国工程机械工业协会施工机械化分会2012年会暨机械化施工新技术经验交流会会刊[C];2012年
4 董润润;刘武君;彭为;;港珠澳大桥珠海口岸开发资金平衡分析[A];2012管理创新、智能科技与经济发展研讨会论文集[C];2012年
5 郑定宁;;港珠澳大桥规模及规划概况[A];第十九届全国桥梁学术会议论文集(上册)[C];2010年
6 王驰;徐群;王学兰;;港珠澳大桥整体物理模型试验管理研究[A];第十六届中国海洋(岸)工程学术讨论会(下册)[C];2013年
7 刘晓东;;港珠澳大桥总体设计与技术挑战[A];第十五届中国海洋(岸)工程学术讨论会论文集(上)[C];2011年
8 陈洋洋;谭平;周福霖;陈树辉;;港珠澳大桥隔震方案的非线性动力学分析[A];第十四届全国非线性振动暨第十一届全国非线性动力学和运动稳定性学术会议摘要集与会议议程[C];2013年
9 李步恩;邱辉元;;港珠澳大桥岛隧工程西人工岛隧道防水施工技术[A];防水堵漏材料及施工技术交流会论文集[C];2014年
10 孟凡超;刘晓东;徐国平;;港珠澳大桥主体工程总体设计[A];第十九届全国桥梁学术会议论文集(上册)[C];2010年
相关重要报纸文章 前10条
1 杨兴云;深中大桥立项在即港珠澳大桥恐添变数[N];经济观察报;2006年
2 本报记者 杨兴云;三地政府两套方案 港珠澳大桥融资难题待解[N];经济观察报;2007年
3 杨兴云;深中大桥立项在即 港珠澳大桥添变数[N];经理日报;2006年
4 本报记者 鲁宓;港珠澳大桥缘何迟迟未动工[N];亚太经济时报;2006年
5 记者 赵民望;“三地三检”破港珠澳大桥难题[N];中华工商时报;2006年
6 发文;港珠澳大桥专责小组成立并召开第一次会议[N];中华建筑报;2007年
7 郑晓波;港珠澳大桥建设加速启动[N];证券时报;2007年
8 本报记者 杜娟邋饶贞 骆建基 刘海健;港珠澳大桥最迟后年开工[N];广州日报;2008年
9 忠欣;广东港珠澳大桥设计对外招标[N];中国海洋报;2008年
10 本报记者 索佩敏;融资问题解决 港珠澳大桥年内开工[N];上海证券报;2009年
相关硕士学位论文 前6条
1 张阳;港珠澳大桥珠海落脚点交通一体化—道路规划的初步研究[D];天津大学;2010年
2 冼超文;港珠澳大桥对珠海市产业政策发展的影响及优化研究[D];吉林大学;2013年
3 刘洹宇;港珠澳大桥对区域发展及交通运输的影响分析研究[D];华南理工大学;2010年
4 王艳珍;港珠澳大桥沉管隧道干坞坞址方案比选与环境影响研究[D];天津大学;2013年
5 汤召志;港珠澳大桥沉管隧道运营通风节能技术研究[D];西南交通大学;2012年
6 孙伟;港珠澳大桥主塔塔身结构模块化吊装有限元分析[D];大连交通大学;2014年
,本文编号:2456584
本文链接:https://www.wllwen.com/kejilunwen/jiaotonggongchenglunwen/2456584.html