综合客运枢纽换乘衔接方案设计与评价
[Abstract]:The integrated passenger transport hub is the product of the common development of the city and the mode of transportation to a certain stage. Large-scale integrated passenger transport hubs are generally based on railways, highways and air transfer hubs, based on the developed urban internal transport network, and centralized layout of bus stations, rail transit stations, taxi stations, social parking lots, etc. The main function is to realize the smooth, fast and convenient flow of people, and to improve the degree of comfort where possible. At present, many big cities in China have carried out the overall layout planning of comprehensive passenger transport hub, and have entered the stage of large-scale construction. In sharp contrast to the rapid development of construction, due to the restriction of the leading management system of our country, there is often a lack of unified planning in the transfer and connection of various modes in the integrated passenger transport hub. The connection between the external traffic mode and the internal traffic mode of the hub is not smooth, the transfer distance is long, the transportation capacity is not matched, and the passengers are stranded for a long time. How to realize the efficient and reasonable transfer connection between the traffic modes in the hub has become an urgent problem to be solved. In this paper, the transfer connection method of passenger transport hub is studied from two aspects of transfer connection organization and transportation capacity matching planning, and the design scheme is evaluated comprehensively. First of all, through the comparative analysis of the advantages and disadvantages of each connection layout mode and transfer mode, based on the concept of "people-oriented, flow-oriented", from railway passenger transport hub and highway passenger transport hub, From the point of view of air passenger transport hub, a feasible design scheme of transfer organization mode is given. Secondly, under the design principle of taking into account the interests of passengers and operators, based on the comprehensive transportation capacity calculation model of external and internal traffic mode of passenger hub, a transportation capacity matching planning method based on dominant mode is proposed. Thirdly, the factors that affect the safety, convenience, timeliness and availability of hub transfer are studied, and the evaluation index system of hub transfer connection scheme is put forward according to the hierarchical structure of "goal-quasi-test-index". The definition and calculation method of each index are given. Based on the characteristics of extenics in dealing with contradictory problems and the combination of quality and quantity, a comprehensive evaluation method of transfer connection scheme based on extension is proposed. Finally, the theoretical results obtained in this paper are applied to Liaoyang Central passenger Station to verify its accuracy and practical maneuverability.
【学位授予单位】:吉林大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:U115
【参考文献】
相关期刊论文 前10条
1 张以晨;佴磊;孟凡奇;王延亮;王洁玉;王立春;;基于最优组合赋权理论的可拓学评价模型的应用[J];吉林大学学报(地球科学版);2011年04期
2 覃煜,晏克非,赵童;城市综合客运交通体系中换乘研究[J];长沙交通学院学报;2000年02期
3 邱丽丽;顾保南;;国外典型综合交通枢纽布局设计实例剖析[J];城市轨道交通研究;2006年03期
4 李映红;陶占盛;秦喜文;王新民;;基于组合赋权法的地质灾害可拓学评价模型研究[J];哈尔滨工业大学学报;2011年11期
5 刘梦涵;汪忠;高建华;;国内外综合客运枢纽规划设计经验与启示[J];交通世界(运输.车辆);2010年04期
6 廖苑伶;徐汝华;崔湘;;铁路客运枢纽站衔接系统设计单方案评价研究[J];交通与运输(学术版);2005年01期
7 柳伍生;余朝玮;程建学;;一种混合评价模型在综合客运枢纽客流组织服务水平评价中的应用[J];交通与运输(学术版);2007年01期
8 王睦;吴晨;王莉;;城市巨构·铁路枢纽——新建北京南站的设计与创作[J];世界建筑;2008年08期
9 李艳红;谢海红;周浪雅;;铁路客运专线中心站与城市交通集散能力匹配关系的研究[J];交通科技;2006年03期
10 倪明;;国内外综合交通枢纽规划设计的启示[J];交通科技;2010年01期
相关博士学位论文 前3条
1 王晶;基于绿色换乘的高铁枢纽交通接驳规划理论研究[D];天津大学;2011年
2 丰伟;城市对外交通综合换乘枢纽系统关键问题理论研究[D];西南交通大学;2010年
3 李松涛;高铁客运站站区空间形态研究[D];天津大学;2010年
本文编号:2481436
本文链接:https://www.wllwen.com/kejilunwen/jiaotonggongchenglunwen/2481436.html