本文选题:竞价上网 + 访问控制 ; 参考:《华北电力大学》2013年硕士论文
【摘要】:在“厂网分开、竞价上网”的大背景下,电厂竞价上网数据直接关系发电调度计划的制定,进而影响电厂的经济利益,绝对不能泄露给竞争对手。另外,发电调度计划不仅用于指导各个电厂进行高效、合理、安全生产,而且影响电能质量和电网的正常运行。因此,,必须确保电厂接收到正确的调度计划并按质按量完成,不会否认或抵赖。 本文研究了基于私有云存储的数据安全问题,并在搭建小型的云存储系统之后,完成了以下几方面的工作: 首先,为了满足对海量数据存储的需求,课题研究了云存储关键技术。详细介绍了云存储的体系结构和开源云计算平台Hadoop的分布式文件系统HDFS,并对HBase的体系结构、逻辑模型和物理模型进行了研究。 其次,对访问控制机制进行了深入分析,重点研究了RBAC模型,设计了一个基于主客体标签的分层访问控制模型。通过在云存储平台中的实现,证明了该模型能够有效保障云存储平台中各电厂发电调度计划的访问控制,并且其性能损耗基本可以忽略,满足实时性要求。 最后,本课题对信息完整性的检测措施进行了研究,深入研究了基于椭圆曲线的数字签名算法。文中利用Matlab工具进行仿真实验,证明了该算法的高效性。
[Abstract]:Under the background of "separation of power plants and power plants, bidding for the Internet", the bidding data of power plants is directly related to the formulation of the power generation scheduling plan, and thus affects the economic interests of the power plants, and must not be leaked to the competitors. In addition, the power generation scheduling plan is not only used to guide the efficient, reasonable and safe production of each power plant, but also affects the power quality and the normal operation of the power grid. Therefore, it is necessary to ensure that the power plant receives the correct dispatching plan and completes it according to quality and quantity, without denying or denying it. This paper studies the data security problem based on private cloud storage, and after building a small cloud storage system, it completes the following work: Firstly, in order to meet the requirement of mass data storage, the key technology of cloud storage is studied. The architecture of cloud storage and the distributed file system HDFS of open source cloud computing platform Hadoop are introduced in detail, and the architecture, logic model and physical model of HBase are studied. Secondly, the access control mechanism is deeply analyzed, the RBAC model is studied, and a hierarchical access control model based on the subject-object label is designed. Through the implementation in cloud storage platform, it is proved that the model can effectively guarantee the access control of power generation scheduling plan of power plants in cloud storage platform, and its performance loss can be basically ignored to meet the real-time requirements. Finally, this paper studies the information integrity detection method, and deeply studies the digital signature algorithm based on elliptic curve. In this paper, the Matlab tool is used to carry out the simulation experiment, and the efficiency of the algorithm is proved.
【学位授予单位】:华北电力大学
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:TP333;TP309.2
【参考文献】
相关期刊论文 前10条
1 康立;杨城;;PS基于身份数字签名算法的改进[J];吉林大学学报(信息科学版);2012年02期
2 薛巧丽;王保义;;基于PKI/PMI和T-RBAC的网格工作流安全模型[J];电力科学与工程;2008年04期
3 姚建国;杨胜春;高宗和;杨志宏;;电网调度自动化系统发展趋势展望[J];电力系统自动化;2007年13期
4 江道灼;申屠刚;李海翔;吴志力;杨贵玉;;基础信息的标准化和规范化在智能电网建设中的作用与意义[J];电力系统自动化;2009年20期
5 王德文;宋亚奇;朱永利;;基于云计算的智能电网信息平台[J];电力系统自动化;2010年22期
6 张志华;周捷;丁可;刘润苗;刘明祥;曾俊;张清福;;非对称数字签名技术在配电自动化系统的应用[J];电气自动化;2012年03期
7 吴至复;曾鸣;;符合国情的统一开放的电力市场体系研究[J];电网技术;2007年10期
8 张健;;全球云计算安全研究综述[J];电信网技术;2010年09期
9 杨斌;邵晓;肖二永;;云计算安全问题探析[J];计算机安全;2012年03期
10 安小明;王小明;王巧玲;;具有时空约束的角色访问控制模型[J];计算机工程与应用;2010年07期
相关博士学位论文 前1条
1 隗云;辫群上的数字签名研究[D];解放军信息工程大学;2011年
相关硕士学位论文 前2条
1 郅斌;一种私有云存储系统的设计与实现[D];北京邮电大学;2011年
2 林建清;云存储环境下数据完整性检验和出错数据恢复技术研究[D];国防科学技术大学;2011年
本文编号:1783353
本文链接:https://www.wllwen.com/kejilunwen/jisuanjikexuelunwen/1783353.html