财税数据中心建设项目管理研究
发布时间:2018-06-22 01:50
本文选题:财政地税 + 数据中心 ; 参考:《天津大学》2012年硕士论文
【摘要】:天津市财政地税信息化发展正逐步由信息资源建设阶段向信息资源运用阶段演进,支持持续提升信息系统整体效能的各个组成部分,如信息安全、整合、开发、配置和管理等。随着数据的集中,为业务应用系统的运行搭建了统一的数据平台,从而减少了对数据维护的成本,提高了数据管理的效率,使业务得到了集中,技术风险的可控性提高,但风险的集中也随之而来。建设财税数据中心,是信息化发展战略和总体规划的重要组成部分,是规避信息系统风险的重要手段和确保信息系统安全可靠运行的重要保障,也是推进财税信息化科学发展的重要举措。财税数据中心的建设任务十分紧迫,具有十分重要的现实意义。 本文在对项目管理的理论与方法进行研究的基础上,对项目管理的前沿学术进行了探讨。针对财税数据中心建设与实施的全过程,对项目的背景、必要性进行详细的分析,着重介绍了项目建设的内容及方式,从项目进度、质量、人力资源、采购、和风险方面进行研究,并对此项目的建设效益进行分析。
[Abstract]:The information development of financial local tax in Tianjin is gradually evolving from the stage of information resource construction to the stage of information resource utilization, which supports the continuous improvement of all components of the overall efficiency of information system, such as information security, integration, development, configuration and management. With the centralization of data, a unified data platform is built for the operation of business application system, which reduces the cost of data maintenance, improves the efficiency of data management, makes the business centralized, and improves the controllability of technical risk. But the concentration of risk also followed. The construction of financial and tax data center is an important part of information development strategy and overall planning, an important means to avoid the risk of information system and an important guarantee to ensure the safe and reliable operation of information system. It is also an important measure to promote the development of finance and taxation information science. The construction task of fiscal and taxation data center is very urgent and has very important practical significance. On the basis of the research on the theory and method of project management, this paper probes into the frontier academic of project management. In view of the whole process of the construction and implementation of fiscal and taxation data center, the background and necessity of the project are analyzed in detail, and the contents and methods of the project construction are emphatically introduced, including project progress, quality, human resources, procurement, etc. And the risk aspect carries on the research, and carries on the analysis to this project construction benefit.
【学位授予单位】:天津大学
【学位级别】:硕士
【学位授予年份】:2012
【分类号】:TP308;F812.7
【参考文献】
相关期刊论文 前10条
1 钟景华;;数据中心接地问题探讨[J];电气应用;2009年18期
2 田敏,邵培基;项目管理团队建设的新思路[J];电子科技大学学报(社科版);2004年04期
3 程志华;李宏发;苏卓;王华宁;周挺;;集中式信息系统容灾中心设计与研究[J];电力信息化;2011年02期
4 王斌君;吉增瑞;;信息安全技术体系研究[J];计算机应用;2009年S1期
5 阎俊爱;荆树伟;闫绪娴;;项目管理专业人才培养的半结构化范式探索[J];科技进步与对策;2011年13期
6 贾栋;;企业信息容灾中心的建立与有效利用[J];科技信息;2010年35期
7 张源;;进度管理与计划调整在施工项目的作用[J];四川建材;2009年03期
8 崔义新;;完善工程总承包项目采购管理工作的策略[J];中国市场;2010年45期
9 马晓辉;;构建数据库服务器系统容灾技术[J];时代经贸(中旬刊);2008年S4期
10 刘广秋;;浅谈网络信息系统运维体系[J];数字技术与应用;2011年01期
相关重要报纸文章 前1条
1 邓雁;[N];上海金融报;2002年
相关硕士学位论文 前1条
1 李建国;数据迁移的项目管理研究[D];上海交通大学;2009年
,本文编号:2051013
本文链接:https://www.wllwen.com/kejilunwen/jisuanjikexuelunwen/2051013.html