新兴测量技术在嵩县庙岭金矿探采矿中的应用
发布时间:2018-04-28 23:01
本文选题:矿山测量 + 探矿 ; 参考:《中国地质大学(北京)》2015年硕士论文
【摘要】:河南省嵩县庙岭金矿于上世纪九十年代就开始采矿作业,至今已有二十年之多,嵩县庙岭金矿经过这么多年的生产建设,已经探明的矿产资源几乎消耗殆尽,矿山受外部环境影响,资源占有率较低,保有资源储量严重不足,因此,庙岭金矿出现资源危机。所以庙岭金矿急需改变目前的情况,必须系统收集区内已有地质资料的基础,矿山测量就是其中重要的一环,可以说矿山测绘成果的好坏直接关系着庙岭金矿后续的发展。基于对嵩县庙岭金矿矿区全矿区地形测量,探矿工程测量(包括钻孔、探槽、坑道等探矿工程),本文建立了庙岭金矿矿区导线控制网16.2km,测量和编绘2000分之一的地形地质图8.6km2;在对矿体的形状、体积、质量等进行测量的基础上,编制了相关图件。编制了采切和掘进工程图等图件。对资源量进行了估算,新增资源储量矿石量1606733吨。按照探明的矿床和现有生产规模进行经济估算,可延长嵩县庙岭金矿的矿山服务年限约为10年。
[Abstract]:The Miaoling Gold Mine of Songxian County, Henan Province, began mining operations in the 1990s and has been in operation for more than 20 years. After so many years of production and construction, the proven mineral resources of the Miaoling Gold Mine in Songxian County have almost been depleted. Under the influence of external environment, the mine has a low share of resources and a serious shortage of reserves. Therefore, there is a resource crisis in Miaoling Gold Mine. Therefore, it is urgent to change the present situation of Miaoling gold mine, and it is necessary to collect the basis of geological data in this area systematically. Mine survey is one of the most important parts. It can be said that the quality of mine surveying and mapping results is directly related to the subsequent development of Miaoling gold mine. Based on the topographic survey, prospecting engineering survey (including boreholes, grooves) in Miaoling gold mine area, Songxian County, In this paper, the traverse control network of Miaoling gold mine area is established in 16.2 km, and the topographic and geological map of 2000th part is measured and drawn up. Based on the survey of the shape, volume and mass of the orebody, the related maps are compiled. Drawing of mining and cutting and tunneling engineering drawing are worked out. Estimated the amount of resources, new reserves of 1606733 tons of ore. The mine service life of Miaoling gold deposit in Songxian County can be extended for about 10 years according to the economic estimation of the proved ore deposit and the existing production scale.
【学位授予单位】:中国地质大学(北京)
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:P618.51
【参考文献】
相关期刊论文 前1条
1 朱丽伟;;利用AUTOCAD实现矿山地质测量地图的数字化[J];黑龙江科技信息;2010年03期
,本文编号:1817254
本文链接:https://www.wllwen.com/kejilunwen/kuangye/1817254.html