【摘要】:露天矿排土运输存在理论上的最优方案,但受限于剥离和排运复杂的实际情况,利用现有算法规划的排运方案,既不能保证整个境界内所有岩石的排运总费用最小,也不能确定境界内每个待排岩石相应的排土信息,难以被有效地运用在矿山实际的排土运输中。本文以露天矿数字矿床模型为研究平台,以剥离岩石块体与排土场空置块体的赋值运算为基本方法,以排土运输总费用最小为目标,设计和研发了“剥-排对位算法”,对境界内每个待排岩石的排土路线和排土位置进行优化,对于通过科学计算指导排土计划优化,降低排土运输成本,提高企业经济效益具有重要作用。本文以采场和排土场的块体模型为研究基础,以排运总运费最小为目标,通过定义与假设若干条件,将总运费问题转化为求解最小总运距问题。以锥体模拟排土场排岩后的最终形态,提出以块体质心点为锥体顶点的锥体排除法来确定当前排土场的若干可排位置;基于锥体排除法和整体运距最小原理,在全境界采剥计划确定了剥离时空关系的基础上,建立了搜索境界内所有块体最小运距的“露天矿剥-排对位算法”。该算法的设计思路是将境界内每个原位块体按采剥顺序依次确定为目标块体,通过锥体排除法确定该目标块体在排土场若干可排位置,运用整体运距最小原理从若干可排位置中确定该目标块体的最优排土位置。本文基于“露天矿剥-排运对位算法”编制的计算机程序,对汽车运输排土和汽车-胶带混合运输排土两种类型的露天矿进行了最小运距逐年排土计划的解算,解算结果通过3DMine矿业软件可实现排运规划的三维可视化,并证明了解算结果的有效性和实用性。
[Abstract]:There is a theoretical optimal scheme for dumping transportation in open-pit mines, but limited by the complicated actual situation of stripping and discharging, the total cost of all rocks in the whole boundary can not be guaranteed to be minimized by using the existing algorithm. It is also impossible to determine the corresponding information of each rock to be discharged in the boundary, so it is difficult to be effectively used in the actual dumping transportation of mines. Based on the digital deposit model of opencast mine, this paper designs and develops a "peeling-alignment algorithm" based on the evaluation operation of stripped rock block and empty block in the dump, with the aim of minimizing the total cost of dumping transportation. The optimization of the drainage route and location of each rock to be discharged in the boundary is of great importance for guiding the optimization of the dumping plan by scientific calculation, reducing the transportation cost and improving the economic benefit of the enterprise. On the basis of block model of stope and dump, this paper takes the minimum total transportation cost as the goal, by defining and assuming some conditions, the problem of total freight is transformed into solving the problem of minimum total transportation distance. By using the cone to simulate the final shape of the discharged rock in the dump, a cone exclusion method with the core of the block as the apex of the cone is proposed to determine some rechargeable positions of the current dump. Based on the conical exclusion method and the principle of minimum total transportation distance, based on the determination of the space-time relationship of stripping in the whole boundary mining plan, an "opencast mine stripping and displacing algorithm" is established to search the minimum transport distance of all blocks in the boundary. The design idea of the algorithm is to determine each in-situ block in the boundary as the target block in the order of mining and stripping, and to determine the displacement position of the target block in the dump by the cone exclusion method. The optimal displacement position of the target block is determined by using the principle of minimum overall transportation distance from a number of deployable positions. Based on the computer program of "opencast mine stripping and displacement matching algorithm", this paper calculates the minimum transportation distance year by year for two types of open pit mine, automobile transport dump and automobile belt mixed transport dump. The results can be visualized by 3DMine mining software, and the validity and practicability of solving the results are proved.
【学位授予单位】:昆明理工大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TD57

【参考文献】

相关期刊论文 前10条

1 刘佶林;戴晓江;王孝东;崔帮全;;露天矿排土运输优化的最优排土堆置体搜索算法研究[J];矿业研究与开发;2016年12期

2 毕林;赵辉;贾明涛;;面向数据库特征的基于LMDB与线性八叉树海量块段模型存储技术(英文)[J];Transactions of Nonferrous Metals Society of China;2016年09期

3 狄长江;王孝东;戴晓江;宋小美;刘佶林;毕春杰;;基于3Dmine矿业软件的露天矿山采剥计划的数值模拟[J];黄金;2016年07期

4 肖罡;杨钦文;李落星;;基于Kriging方法的6013铝合金平面热压缩变形本构关系建模(英文)[J];Transactions of Nonferrous Metals Society of China;2016年04期

5 毕春杰;戴晓江;宋小美;;某露天铜矿全境界开采规划优化[J];金属矿山;2015年10期

6 狄长江;戴晓江;宇文巍;;基于3DMine软件的多金属矿山不同露天开采境界优化方法的对比[J];黄金;2015年08期

7 余牛奔;齐文涛;王立欢;木合塔尔·扎日;李刚;;基于3DMine软件的三维地质建模及储量估算——以新疆巴里坤矿区某井田为例[J];金属矿山;2015年03期

8 左兴权;王春露;赵新超;;一种结合多目标免疫算法和线性规划的双行设备布局方法[J];自动化学报;2015年03期

9 王青;顾晓薇;胥孝川;刘剑平;;露天矿生产规划要素整体优化方法及其应用[J];东北大学学报(自然科学版);2014年12期

10 顾晓薇;胥孝川;王青;刘剑平;;金属露天矿生产计划优化算法的改进[J];东北大学学报(自然科学版);2014年10期

相关硕士学位论文 前5条

1 刘佶林;基于数字矿床模型的露天排运规划优化研究[D];昆明理工大学;2015年

2 宋小美;基于数字化矿床模型的露天开采规划优化研究[D];昆明理工大学;2014年

3 孙长坤;多金属露天矿边际品位优化与应用研究[D];昆明理工大学;2014年

4 余文章;基于矿床数字模型的露天采剥方案优化方法研究[D];昆明理工大学;2012年

5 刘明;基于线性规划的排岩优化模型的建立及其应用研究[D];武汉科技大学;2006年



本文编号:2392228

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/kuangye/2392228.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户eda15***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com