输电线路工程水土保持监测样点布设探讨

发布时间:2018-05-08 04:31

  本文选题:输电线路工程 + 分层抽样 ; 参考:《人民长江》2017年16期


【摘要】:输电线路工程线路长、空间跨度大、扰动分散,造成水土流失呈点状分布,使得布设样点监测输电线路工程的水土保持状况极为困难。以糯扎渡送电广东±800 k V直流输电工程(云南区)为例,利用分层抽样和预监测的方法计算出水土保持监测样点的样本容量,并采用适度法对样本容量进行分配,提出了结合施工现场的输电线路水土保持监测样点布设方案,结果可为同类地区线型工程水土保持监测样点的布设提供依据和参考。
[Abstract]:Because of the long transmission line, large space span and scattered disturbance, the soil and water loss is distributed in the form of points, which makes it very difficult to monitor the soil and water conservation of transmission line project by setting up sample points. Taking Nuozhadu 卤800kV HVDC transmission project (Yunnan area) as an example, the sample capacity of soil and water conservation monitoring sample is calculated by stratified sampling and pre-monitoring, and the sample capacity is distributed by appropriate method. In this paper, a scheme of monitoring sample points for water and soil conservation of transmission lines combined with construction site is put forward. The results can provide the basis and reference for the layout of soil and water conservation monitoring sample points of similar projects in the same area.
【作者单位】: 云南省水利水电科学研究院;
【分类号】:S157;TM75

【相似文献】

相关期刊论文 前3条

1 刘楚文;;猴桥水电站水土保持监测方案制定简介[J];水土保持应用技术;2006年04期

2 卞齐步;瀑布沟水电站水土保持监测方案编制完成[J];水力发电;2004年11期

3 钟云飞;巴丽敏;;龙桥水电站工程水土保持监测工作[J];湖北水力发电;2007年S1期

相关会议论文 前1条

1 钟云飞;巴丽敏;;龙桥水电站工程水土保持监测工作[A];热烈庆祝龙桥水电站提前发电论文集[C];2007年

相关硕士学位论文 前1条

1 余铭铨;四川大渡河沙坪二级水电站水土保持监测评价[D];西北农林科技大学;2016年



本文编号:1859979

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/nykj/1859979.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户e35d9***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com