煤矿设计科学产能形成机制探讨
发布时间:2018-03-11 03:40
本文选题:煤矿设计 切入点:科学产能 出处:《煤炭学报》2017年S1期 论文类型:期刊论文
【摘要】:设计阶段是科学确定煤矿生产能力的重要关口,从根本上影响或决定着矿井的生产规模、安全保障及对生态环境的影响程度。现行的煤矿设计生产能力计算时仅以储量备用系数进行调节,具有一定的随意性和盲目性。在科学采矿与科学产能研究成果的基础上,提出了煤矿设计科学产能指数的概念。以煤炭资源勘探程度、资源禀赋条件、开采机械化水平、绿色开采措施、资源采出率等为基础,构建了煤矿设计科学产能指数评价指标体系和计算模型,研究了煤矿设计科学产能的计算方法,开发了用于煤矿设计阶段的煤炭科学产能计算系统软件。
[Abstract]:The design stage is to scientifically determine the important juncture of mine production capacity, affected the mine production scale fundamentally, safety and impact on the ecological environment of coal mine design production capacity calculation. Only when the current reserve coefficient is adjusted with a certain randomness and blindness. On the basis of scientific mining with the capacity of scientific research, put forward the concept of coal mine design scientific productivity index. To the extent of coal resources exploration, resources, mining mechanization level, green mining, resource recovery rate as the basis, to build a coal scientific design productivity index index system and evaluation calculation model, calculation method research the coal scientific design capacity, design stage for coal coal science productivity calculation software is developed.
【作者单位】: 河南理工大学能源科学与工程学院;煤炭安全生产河南省协同创新中心;
【基金】:国家自然科学基金资助项目(51474096,51074066)
【分类号】:TD822;TP311.52
【相似文献】
相关期刊论文 前10条
1 ;2001上半年《煤矿设计》总目录[J];煤炭工程;2001年12期
2 李林魁;;关于煤矿设计中几个问题的探讨[J];内蒙古煤炭经济;2009年05期
3 赖德泉;;煤矿设计若干问题及纠正建议[J];采矿技术;2010年S1期
4 黄侨;;浅析中国煤矿设计[J];能源与节能;2012年09期
5 ;“煤矿设计”1954—1956年总目录[J];煤矿设计;1957年01期
6 ;《煤矿设计》1979年总目录[J];煤矿设计;1979年06期
7 ;《煤矿设计》1980年总目录[J];煤矿设计;1980年06期
8 ;全国煤矿设计工作会议简况[J];煤矿设计;1981年07期
9 ;《煤矿设计》1981年总目录[J];煤矿设计;1981年12期
10 ;煤矿设计工作者的光荣使命[J];煤矿设计;1983年12期
相关会议论文 前1条
1 赖德泉;;煤矿设计若干问题及纠正建议[A];创新推动新型煤炭工业体系建设和安全健康发展——2010年湘赣皖闽苏等多省(市)煤炭学会学术交流暨湖南省煤炭科技论坛论文集[C];2010年
相关重要报纸文章 前1条
1 记者 岳大伟;我部出台煤炭勘查规范实施意见[N];地质勘查导报;2007年
,本文编号:1596446
本文链接:https://www.wllwen.com/kejilunwen/ruanjiangongchenglunwen/1596446.html