工程项目中建筑信息模型应用能力的多层次熵物元评价
发布时间:2018-04-23 13:29
本文选题:BIM + 应用能力 ; 参考:《科技管理研究》2017年07期
【摘要】:从安全管理、成本控制、进度控制、质量控制和信息管理5个方面总结归纳工程量统计等18项影响指标,构建工程项目施工过程BIM应用能力5A评价指标体系;将多层次熵权法与物元分析法相结合,建立应用能力评价模型。对哈尔滨太平机场T2航站楼工程进行实证分析,结果表明该评价模型具有较强的适用性,BIM在成本和进度控制方面应用能力强。
[Abstract]:From 5 aspects of safety management, cost control, schedule control, quality control and information management, this paper sums up 18 influential indexes, such as engineering quantity statistics, and constructs 5A evaluation index system of BIM application ability in the construction process of engineering projects. The multi-level entropy weight method and matter-element analysis method are combined to establish the application ability evaluation model. The empirical analysis of Harbin Taiping Airport T2 Terminal Project shows that the evaluation model has a strong applicability and BIM has a strong ability to apply in cost and schedule control.
【作者单位】: 东北林业大学土木工程学院;
【基金】:“十二五”国家科技支撑计划项目“村镇建设标准体系及关键技术标准研究”(2012BAJ19B00)
【分类号】:TU71;TU17
【相似文献】
相关期刊论文 前2条
1 张云升,孙伟,刘斯凤;混凝土绿色度量化评价体系的研究[J];工业建筑;2002年05期
2 ;[J];;年期
相关会议论文 前1条
1 王峰;王敬敏;;基于多级物元分析的建筑工程承包商风险评价研究[A];第九届中国青年信息与管理学者大会论文集[C];2007年
相关硕士学位论文 前1条
1 张圣银;基于物元分析的旧混凝土建筑再利用价值研究[D];内蒙古科技大学;2008年
,本文编号:1792164
本文链接:https://www.wllwen.com/kejilunwen/ruanjiangongchenglunwen/1792164.html