当前位置:主页 > 科技论文 > 施工技术论文 >

建筑企业项目部作业成本核算体系研究

发布时间:2018-02-27 08:09

  本文关键词: 建筑企业 项目部 作业成本法 成本核算体系 激励机制 出处:《华中科技大学》2013年硕士论文 论文类型:学位论文


【摘要】:建筑企业实施建设每一个工程项目,,其期望达到的目标是在质量和安全达标的前提下尽量降低施工成本并达到项目经济效益最大化的目标。随着我国市场经济体制的不断深入,建筑市场竞争的日趋激烈。本文通过查阅相关资料发现,目前传统的包括成本核算体系在内的成本管理做法,已越来越显示出局限性和弊端。 本文提出项目部作业成本法核算的流程,并通过运用作业成本法计算成本的实例说明作业成本法与传统成本计算方法相比的优势,进一步说明运用作业成本法建立成本核算系统的重要性和可行性。在此基础上本文进一步设计企业对项目部成本核算业务流程,通过规范各项业务的审批和跟踪控制流程,加强项目实施全过程中企业对项目部以成本核算为基础的成本管控能力,保持项目较高的盈利水平,提升企业的竞争力。本文还考虑到在成本核算体系的推行过程中建筑企业与项目部的目标利益的不一致性,运用博弈论的观点建立不完全信息的动态博弈模型,分析建筑企业在推行成本核算体系中的项目责任成本考核环节对项目部成本控制的激励机制,并提出相应的建议。 最后,本文在总结研究成果的基础上提出本文研究尚未解决的问题,并提出在网络信息化大力发展的环境下,作业成本法与建筑企业资源计划相对接的应用展望。
[Abstract]:With the deepening of the market economy system in our country, the construction enterprises are expected to achieve the goal of reducing the construction cost and maximizing the economic benefits of the project under the premise of quality and safety standards. The competition in the construction market is becoming more and more fierce. This paper finds that the traditional cost management practices, including the cost accounting system, have more and more limitations and drawbacks. This paper presents the process of Activity-Based costing (ABC) in the Project Department, and illustrates the advantages of ABC compared with the traditional costing method through an example of cost calculation by Activity-Based costing (ABC). The importance and feasibility of using activity-based costing to establish cost accounting system are further explained. On this basis, this paper further designs the cost accounting business process of the project department, through standardizing the approval and tracking control process of each business, Strengthen the cost control ability of the project department based on cost accounting during the whole process of project implementation, and maintain the high profit level of the project. This paper also takes into account the inconsistency of the objective interests between the construction enterprise and the project department during the implementation of the cost accounting system, and establishes a dynamic game model of incomplete information by using the view of game theory. This paper analyzes the incentive mechanism of project responsibility cost assessment in the implementation of cost accounting system for construction enterprises to control the cost of project department, and puts forward some corresponding suggestions. Finally, on the basis of summarizing the research results, this paper puts forward the unsolved problems in this paper, and puts forward the prospect of the application of Activity-Based costing (ABC) and Construction Enterprise Resource Planning (ERP) in the environment of network information development.
【学位授予单位】:华中科技大学
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:F275.3;TU723.3

【参考文献】

相关期刊论文 前10条

1 郭婧娟;我国与发达国家工程造价管理模式的比较分析[J];北方交通大学学报(社会科学版);2003年01期

2 江剑华;;房地产开发项目前期成本控制研究[J];财经界(学术版);2008年02期

3 李玲;;建筑施工企业项目成本的动态管理探究[J];财经界(学术版);2011年02期

4 李松根;;市政工程施工的成本影响因素及控制方法探讨[J];经营管理者;2011年16期

5 王学通;;非对称信息条件下建筑企业市场声誉博弈分析[J];广州大学学报(自然科学版);2006年04期

6 刘银国;;基于委托—代理理论的国有企业经营者激励机制研究[J];经济问题探索;2007年01期

7 李庆川;李德英;;浅析战略成本管理在工程项目建设中的应用[J];价值工程;2008年04期

8 欧佩玉,王平心;作业分析法及其在我国先进制造企业的应用[J];会计研究;2000年02期

9 胡奕明;ABC、ABM在我国企业的自发形成与发展[J];会计研究;2001年03期

10 张蕊;饶斌;吴炜;;作业成本法在卷烟制造业成本核算中的应用研究[J];会计研究;2006年07期



本文编号:1541844

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/sgjslw/1541844.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户9cd23***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com