当前位置:主页 > 科技论文 > 施工技术论文 >

深基坑开挖与临近既有城际铁路的相互影响研究

发布时间:2018-08-31 11:45
【摘要】:随着我国高速城际铁路建造的快速发展以及基坑工程大规模的建设,在工程建设中,必然遇到基坑开挖与临近既有城际铁路线相互影响的问题。本文以临近沪宁城际的小红山汽车客运站基坑工程为项目背景,运用大型有限元软件ABAQUS,建立静力分析和动力分析模型,对深基坑开挖与城际铁路的相互影响进行了研究,主要的研究内容和成果如下: (1)依据小红山客运站基坑工程的实际条件,建立了有限元模型,分析了基坑开挖和动荷载作用下双排桩支护结构的特点及路基的动力响应特征,并将计算结果与基坑工程实测数据进行了对比,验证了模型的有效性。 (2)对比分析了150km/h、200km/h、250km/h、300km/h、350km/h等五种不同列车时速下支护结构的内力、水平位移及地表变形,结果表明,列车时速的增加,双排桩弯矩值有明显的增加,双排桩水平位移及地表沉降和隆起略有增加。 (3)通过对城际铁路与基坑不同距离下,基坑双排桩弯矩、水平位移、地表隆起的分析,认为两者距离4倍基坑深度以内时,在支护结构设计中,应考虑城际铁路对基坑支护结构的影响。 (4)对比分析了双排桩及被动区土体加固与仅采用双排桩支护下,路基x方向、y方向的动响应特征,结果表明采用双排桩支护及被动区土体加固,相比仅采用双排桩支护,能显著降低基坑开挖引起的路基侧移、沉降等不利影响。 (5)对比分析了不同基坑开挖深度下,路基变形、振动及动应力特征,结果表明,基坑开挖深度对路基的影响主要体现在增大路基的水平侧移,竖向沉降,路基的差异沉降以及增大基床表层x方向拉应力。
[Abstract]:With the rapid development of high-speed inter-city railway construction in China and the large-scale construction of foundation pit engineering, the problem of interaction between excavation and adjacent intercity railway lines is inevitable in the engineering construction. In this paper, based on the foundation pit project of Xiaohong Mountain passenger Station near the city of Shanghai and Nanjing, the static and dynamic analysis models are established by using the large-scale finite element software ABAQUS, and the interaction between the excavation of deep foundation pit and the inter-city railway is studied. The main research contents and results are as follows: (1) according to the actual conditions of foundation pit engineering in Xiaohong Mountain passenger Station, the finite element model is established. The characteristics of double-row pile supporting structure under excavation and dynamic load of foundation pit and the dynamic response of roadbed are analyzed, and the calculated results are compared with the measured data of foundation pit engineering. The validity of the model is verified. (2) the internal force, horizontal displacement and surface deformation of the support structure under different train speeds are compared and analyzed. (2) the internal force, horizontal displacement and surface deformation of the support structure with the speed of 150 km / h are compared and analyzed. The results show that the bending moment of the double-row pile increases obviously with the increase of the speed of the train, and the value of the bending moment of the double-row pile is obviously increased with the increase of the speed of the train. The horizontal displacement, ground subsidence and uplift of double-row piles are slightly increased. (3) through the analysis of bending moment, horizontal displacement and surface uplift of double-row piles at different distances between inter-city railway and foundation pit, When the distance between them is within 4 times of the depth of foundation pit, the influence of inter-city railway on the supporting structure of foundation pit should be considered in the design of supporting structure. The dynamic response characteristics of roadbed in x direction and y direction show that using double row pile support and soil reinforcement in passive zone can significantly reduce the lateral displacement of subgrade caused by excavation of foundation pit, compared with only adopting double row pile support. (5) the characteristics of subgrade deformation, vibration and dynamic stress under different excavation depth are compared and analyzed. The results show that the influence of excavation depth on subgrade is mainly reflected in increasing the horizontal lateral displacement of subgrade. Vertical settlement, differential settlement of subgrade and increase of tensile stress in X direction of the surface layer of foundation bed.
【学位授予单位】:南京大学
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:TU473.2;U212.22

【参考文献】

相关期刊论文 前10条

1 李双洋;张明义;张淑娟;黄志军;;列车荷载下青藏铁路冻土路基动力响应分析[J];冰川冻土;2008年05期

2 吴璀余;;紧邻既有铁路深基坑开挖支护方案模拟分析与计算[J];国防交通工程与技术;2010年04期

3 郅友成;;既有铁路旁基坑开挖对高填方路堤稳定性的影响研究[J];公路交通科技;2006年03期

4 李梅芳;肖军华;宫全美;周顺华;;邻近既有线深基坑开挖过程中的动力响应分析[J];华东交通大学学报;2011年05期

5 何颐华,杨斌,金宝森,李瑞茹,,谭永坚,王铁宏;双排护坡桩试验与计算的研究[J];建筑结构学报;1996年02期

6 杨德健;王铁成;尹建峰;;双排桩支护结构受力特征与土压力计算分析[J];建筑科学;2007年09期

7 黄国铭;熊巨华;;双排桩支护结构的工程应用与性能研究[J];山西建筑;2008年15期

8 樊宇强;;双排桩基坑支护在临近既有线基坑开挖的应用[J];山西建筑;2009年16期

9 熊巨华;一类双排桩支护结构的简化计算方法[J];勘察科学技术;1999年02期

10 孙鹏,夏景仁,李春国,李燕伟;较大动荷载作用下深基坑的支护[J];辽宁建材;2005年04期

相关博士学位论文 前4条

1 胡萍;高速铁路无砟轨道密集过渡段路基动力试验与仿真分析[D];中南大学;2010年

2 聂志红;高速铁路轨道路基竖向动力响应研究[D];中南大学;2005年

3 陈震;高速铁路路基动力响应研究[D];中国科学院研究生院(武汉岩土力学研究所);2006年

4 张国亮;紧邻既有线地铁车站深基坑工程稳定与变形特性研究[D];中南大学;2012年

相关硕士学位论文 前10条

1 张明瑞;门型抗滑桩支护滑坡时受力特性的数值模拟研究[D];南京大学;2011年

2 李玲英;高速铁路中小跨度桥梁活载设计标准的研究[D];中南大学;2011年

3 许杰;软土地区铁路既有线动力响应测试及提速列车—路基动力作用特性研究[D];上海交通大学;2011年

4 孙铭心;高压旋喷桩工程特性研究[D];大连理工大学;2000年

5 杨靖;考虑尺寸效应的双排桩的有限元分析[D];天津大学;2006年

6 张碧;高速铁路路基动力响应分析[D];长安大学;2007年

7 王俊生;地铁盾构隧道施工与运营对城际铁路路基沉降的影响[D];北京交通大学;2010年

8 范生波;高速铁路无砟轨道路基动响应测试分析[D];西南交通大学;2010年

9 陈鼎;高速铁路路基动力响应及影响因素研究[D];中南大学;2010年

10 田雪梅;双排桩支护结构的理论分析及数值计算[D];太原理工大学;2012年



本文编号:2214888