【摘要】:为解决黄河上游龙羊峡水库防洪与兴利之间的矛盾,采用水文特征值统计法、矢量统计法、模糊分析法及成因分析法等方法对龙羊峡水库1956年~2014年的洪水资料进行汛期分期计算。通过对比分析,确定龙羊峡水库的主汛期为6月23日~9月1日。为避免以往研究者对汛期分期成果进行合理性和真实性检验存在的一些逻辑漏洞和理论缺陷,采用改进的Cunderlik法对龙羊峡水库汛期分期结果的合理性进行检验。检验结果表明,龙羊峡水库汛期分期结果合理有效。
[Abstract]:In order to solve the contradiction between flood control and profit of Longyangxia Reservoir in the upper reaches of the Yellow River, the statistical method of hydrological characteristic value and vector statistics method are adopted. The flood data of Longyangxia Reservoir from 1956 to 2014 were calculated by stages in flood season by means of fuzzy analysis and genetic analysis. The main flood season of Longyangxia Reservoir is determined to be from June 23rd to September 1st. In order to avoid some logical loopholes and theoretical defects existing in the rationality and truthfulness test of flood season stage results by previous researchers. The rationality of flood season staging results of Longyangxia reservoir is tested by using the improved Cunderlik method. The results show that the results of flood season staging of Longyangxia reservoir are reasonable and effective.
【作者单位】: 河海大学水文水资源学院;新疆乌鲁木齐水文水资源勘测局;
【基金】:国家自然科学基金面上项目(41471014) 国家社会科学基金资助项目(2012&ZD214)
【分类号】:TV697.13
【正文快照】: 水库的汛期分期计算研究始于20世纪50、60年代,伴随着学者提出成因分析法[1]、数理统计法[2]、模糊分析法[3]、变点分析法[4]、分形分析法[5]等分期方法和理论,汛期分期的研究从简单的定性分析或定量计算阶段发展到定性与定量相结合运用的智能阶段;汛期分期的精度也从月、旬精
【参考文献】
相关期刊论文 前7条
1 蒋海艳;莫崇勋;韦逗逗;孙桂凯;魏炜;;水库汛期分期研究综述[J];水利水电科技进展;2012年03期
2 陈璐;郭生练;刘攀;李响;方彬;;汛期分期合理性检验方法及应用研究[J];中国防汛抗旱;2008年04期
3 刘攀,郭生练,王才君,张洪刚;三峡水库汛期分期的变点分析方法研究[J];水文;2005年01期
4 侯玉,吴伯贤,郑国权;分形理论用于洪水分期的初步探讨[J];水科学进展;1999年02期
5 史良如,陈继东;利用水文气象和统计规律对海河流域中南部水库汛期控制运用的研究[J];水文;1996年06期
6 陈守煜;从研究汛期描述论水文系统模糊集分析的方法论[J];水科学进展;1995年02期
7 陈守煜;论绝对隶属度及其确定[J];大自然探索;1995年02期
【共引文献】
相关期刊论文 前10条
1 莫崇勋;钟欢欢;王大洋;李桂新;廖浩U,
本文编号:1422093
本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/1422093.html