以抽水蓄能电站为主要调频手段的电网AGC控制策略
发布时间:2018-01-31 18:56
本文关键词: 火电-抽蓄电站 机组组合 发电控制 AGC容量 PSO算法 出处:《华北电力大学》2014年硕士论文 论文类型:学位论文
【摘要】:以抽水蓄能电站为主要调频手段的多源电力系统发电调度策略的研究,旨在提高电力系统频率控制质量和保障电力系统的经济性与稳定性。对水电机组动态特性及机组组合问题进行分析,建立了以充分发挥抽水蓄能电站调节能力、限制火电出力、快速实现区域控制偏差(ACE)调节至零为目的,兼顾火电煤耗经济目标与系统调差时间最短目标,综合考虑库容、机组出力限制等实际问题的约束处理的决策模型。算法实现过程中,引入时间权重W值,将多目标转化为单目标进行寻优处理;通过权值W的动态调整,可实现多源电力系统时间指标与经济指标控制比重的灵活调整。 综合考虑现代电力系统新能源并网趋势,风电机组功率偏差被纳入区域控制偏差(ACE)信号组成结构,提出了风电透极限功率分区控制与AGC容量调整的思路,并建立风电扰动、火电-抽蓄机组调节的发电控制系统模型。研究了计及风电扰动的ACE模型下的多源电力AGC系统,仿真证明新系统在抑制较大功率波动方面较传统AGC系统具有相对更好的频率控制效果。
[Abstract]:Research on Generation scheduling Strategy of Multi-source Power system with pumped Storage Power Station as the main FM method. In order to improve the quality of frequency control in power system and ensure the economy and stability of power system, the dynamic characteristics of hydropower unit and the problems of unit combination are analyzed, and the regulating ability of pumped storage power station is established. The purpose of limiting thermal power output and realizing regional control deviation adjustment to zero is to take into account the economic goal of coal consumption of thermal power and the shortest time of system adjustment, and to consider the storage capacity synthetically. Decision model for constrained processing of practical problems such as generating force limitation. In the process of implementation of the algorithm, the time weight W value is introduced, and the multi-objective is transformed into single objective for optimization processing. Through dynamic adjustment of weight W, the control proportion of time index and economic index of multi-source power system can be adjusted flexibly. Considering the trend of grid connection of new energy in modern power system, the power deviation of wind turbine is incorporated into the structure of ACE-signal. The paper puts forward the idea of district control of wind power permeable limit power and AGC capacity adjustment, and establishes wind power disturbance. The power generation control system model of thermal power pumped storage unit. The multi-source power AGC system based on ACE model with wind disturbance is studied. Simulation results show that the new system has a better frequency control effect than the traditional AGC system in restraining large power fluctuations.
【学位授予单位】:华北电力大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:TV743
【参考文献】
相关期刊论文 前9条
1 祁碧茹;;对我国农网发展投资的政策建议[J];电力技术经济;2009年03期
2 庄丽蓉;蔡金锭;李天友;;电力市场条件下地市级电网优化购电模型[J];电网技术;2007年17期
3 张洪波;刘颖利;;电力市场下基于改进遗传算法的AGC机组的选择[J];广东电力;2008年02期
4 汪德星,杨立兵;自动发电控制(AGC)技术在华东电力系统中的应用[J];华东电力;2005年01期
5 徐友平,何毅斌;华中电网频率质量变迁及分析[J];华中电力;2002年S1期
6 万春秋;王峻;杨耕;张兴;;动态评价粒子群优化及风电场微观选址[J];控制理论与应用;2011年04期
7 张步涵;张国强;;水火电系统日负荷经济分配及发电机组启停的实用计算[J];水电能源科学;1992年04期
8 程春田;唐子田;李刚;杨斌斌;;动态规划和粒子群算法在水电站厂内经济运行中的应用比较研究[J];水力发电学报;2008年06期
9 周义德;刘磊;高龙;杨瑞梁;;大型集中空调循环水系统停泵水锤成因分析及防护[J];中原工学院学报;2012年05期