【摘要】:远距离输水工程已成为缺水地区水资源严重短缺局面的重要工程手段。溢流塔在长输工程中起着保护管道,防止水击发生,稳定管道内压强和流态的重要作用。传统的溢流塔有着结构复杂,工程投资高等缺点,本文在分析了传统溢流塔的基础上提出了双管式稳压溢流塔这一新型溢流塔,采用物理模型试验的方法对其水力特性进行了研究。本文所做工作有如下几点: (1)介绍了长距离输水工程的现实意义,并对输水管道中水击压力的危害做了梳理,指出了溢流塔对保障输水管道安全运行具有的重要作用。 (2)双管式溢流塔在结构上与虹吸管具有相似性,因此对虹吸管原理进行了概括,并将其与双管式溢流塔进行比较。研究了溢流塔上水竖管中水流流速的分布规律和泄水竖管中水流的流态,并分析了溢流塔中压强的变化,并指出溢流塔在工程运行中应注意的事项。 (3)研究了溢流塔泄流时流量与压强的关系,总结了溢流塔顶部出现负压的原因。 (4)结合工程实际,对原方案进行了优化改进,给出了溢流塔压力水头与泄流量的关系式,为工程实践提供参考。
[Abstract]:An important means of long-distance water transfer project has become a serious shortage of water resources shortage area situation. Overflow tower plays in the long distance pipeline protection project, to prevent water hammer occurs, an important role in stabilizing the pipeline pressure and flow. The traditional overflow tower has a complex structure, project investment disadvantages, based on the analysis of the the traditional overflow tower on the double pipe type regulator overflow tower which is a new type of overflow tower, using the method of physical model test was carried out to study the hydraulic characteristics. The work of this paper are as follows:
(1) the practical significance of long distance water conveyance project is introduced, and the harm of water hammer pressure in water conveyance pipeline is combed. It is pointed out that the overflow tower plays an important role in ensuring the safe operation of water conveyance pipeline.
(2) double tube type overflow tower structure and the rainbow Straw is similar, so the Hong Straw principle were summarized, and compared with the double pipe overflow tower. The flow velocity of fluid flow in the standpipe water overflow tower distribution and drainage standpipe, and analyzes the changes of pressure relief in the tower, and points out matters overflow tower should be paid attention to in the running process of the project.
(3) the relationship between the flow and pressure of the overflow tower is studied, and the cause of the negative pressure on the top of the overflow tower is summarized.
(4) combined with the actual project, the original scheme was optimized and improved, and the relationship between the pressure head of the overflow tower and the discharge flow was given, and the reference for the engineering practice was provided.

【学位授予单位】:大连理工大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:TV67;TV134

【参考文献】

相关期刊论文 前10条

1 赵晔;康筱峰;;数学在水电站调压塔方面的应用[J];长沙大学学报;2010年05期

2 朱鹏;张雷;;城市化与水资源相互关系研究述评[J];城市问题;2008年11期

3 崔莉;溢流塔泄流脉动压力的谱分析[J];大连工学院学报;1982年03期

4 尹福才,赵希江,戴求时;虹吸式放水管的计算方法及在小型水库中的应用[J];黑龙江水专学报;2004年04期

5 王建新,王彤;输水管道事故的成因及对策[J];吉林水利;2004年09期

6 尚全夫;;高塔泄流时水垫消能工消能率的计算方法[J];金属矿山;1987年07期

7 黄健;覃建奎;;压力管道工程水锤现象分析及防止措施[J];民营科技;2009年12期

8 朱智伟;;南水北调渠道倒虹吸工程的水力计算[J];河南水利与南水北调;2009年06期

9 吴永新;;加强水资源保护是实现生态文明的核心[J];江苏水利;2010年01期

10 冯景星;;对南水北调工程的几点认识[J];河北水利;2008年09期



本文编号:1570759

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/1570759.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户d066c***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com