钢护筒钢筋混凝土桩大水位差深水码头结构力学性能试验研究
本文选题:钢护筒钢筋混凝土桩 切入点:试验研究 出处:《重庆交通大学》2014年硕士论文 论文类型:学位论文
【摘要】:本文结合“重庆市重大科技专项(交通基础设施建设)——重庆港大水位差深水码头设计、建设关键技术攻关与应用”研究项目,依托重庆果园港码头结构二期工程,开展了钢护筒钢筋混凝土桩大水位差深水码头结构力学性能试验研究和数值模拟研究。主要的研究内容和相关结论有: ①结合实际工程,完成了模型设计,包括模型材料的确定、材料参数的确定、模型材料的换算、模型的制作、测点的布置及加载的设计,并利用数学编程软件Matlab对大量试验数据进行了提取及整理。 ②根据试验模型,运用有限元软件Ansys分别建立了考虑钢护筒和钢筋混凝土桩接触的简化实体单元模型,以及未考虑钢护筒和钢筋混凝土桩接触的梁单元模型。对比分析了两种建模方法的差异性。结合试验测试数据对比可知,简化实体模型和试验数据吻合度较好,主要是由于实体模型能较真实的反映复合材料各自的受力特点、钢构件焊接点刚度特征和截面的不规则性,但也及易受焊接截面不规则性和集中荷载引起的应力集中的影响。 ③运用简化实体模型的建模方法建立了原型结构的数值模型,开展了原型和模型的对比分析,完成了模型到原型的推算。并分析了同一竖向荷载或水平荷载作用下最不利排架中桩基的力学特性,以及不同竖向荷载或横向荷载作用下钢筋混凝土桩、钢横撑、钢靠船立柱和钢前撑的力学特性。明确了单一荷载作用下结构的薄弱环节及各构件最不利的关键点,为分析组合效应的力学机理提供了依据,也为新型码头结构的优化提供了参考。 ④钢护筒钢筋混凝土桩在单一竖向荷载或横向荷载作用下,从桩顶到钢构件焊接点,钢护筒的等效应力值占桩的80%左右。从钢构件焊接点到桩底,当竖向荷载作用时,钢护筒发挥的作用逐渐减小,钢筋混凝土桩逐渐发挥作用;当横向荷载作用时,桩的岸侧处于最不利状态,钢护筒岸侧的应力分布基本呈倒“R”型,此区段发挥承力的主要作用,钢筋混凝土桩也逐渐发挥作用。
[Abstract]:Based on the research project of "Chongqing Major Science and Technology Project (Traffic Infrastructure Construction-Deepwater Wharf Design, key Technology Construction and Application of Chongqing University Water level difference", this paper relies on Chongqing Orchard Port Wharf structure Phase II Project. The experimental study and numerical simulation study on the structural mechanical properties of steel-protected reinforced concrete piles with large water level difference deep water wharf are carried out. The main research contents and relevant conclusions are as follows:. The main contents are as follows: 1. The model design is completed, including the determination of the model material, the determination of the material parameters, the conversion of the model material, the making of the model, the layout of the measuring points and the design of the loading. A large number of experimental data are extracted and sorted by mathematical programming software Matlab. (2) based on the test model, a simplified solid element model considering the contact between steel retaining cylinder and reinforced concrete pile is established by using finite element software Ansys, respectively. And the beam element model without considering the contact between steel retaining tube and reinforced concrete pile. The differences between the two modeling methods are compared and analyzed. Combined with the test data, it can be seen that the simplified solid model is in good agreement with the test data. It is mainly due to the fact that the solid model can truly reflect the stress characteristics of composite materials, the stiffness characteristics of welded joints and the irregularity of the sections of steel members, but it is also easy to be affected by the stress concentration caused by the irregularity of welding sections and the concentrated loads. (3) the numerical model of prototype structure is established by using the modeling method of simplified entity model, and the comparative analysis of prototype and model is carried out. The calculation from the model to the prototype is completed, and the mechanical properties of pile foundation in the most unfavorable bent frame under the same vertical load or horizontal load are analyzed, as well as the reinforced concrete pile and steel transverse brace under different vertical or transverse loads. The mechanical properties of steel berthing column and steel front brace are defined. The weak links of the structure under single load and the most unfavorable key points of each member are identified, which provides a basis for analyzing the mechanical mechanism of the combined effect. It also provides a reference for the optimization of the new wharf structure. (4) under the action of single vertical load or transverse load, the equal effect force value of steel retaining cylinder is about 80% of the pile from the top of the pile to the welded joint of the steel member, and from the welding point of the steel member to the bottom of the pile, when the vertical load is applied, The function of steel retaining tube decreases gradually, and that of reinforced concrete pile gradually exerts its function, when the lateral load is acted on, the bank side of the pile is in the most disadvantageous state, and the stress distribution of the bank side of the steel guard tube is basically inverted "R" type, and this section plays the main role of bearing force. Reinforced concrete piles also gradually play a role.
【学位授予单位】:重庆交通大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:U656.1
【相似文献】
相关期刊论文 前10条
1 高纪兵,何平,何官健,柏争;苏通大桥北索塔墩大直径超长钢护筒施沉工艺[J];施工技术;2005年S1期
2 崔雪梅;吴泽和;;大直径钢护筒下沉施工设备及其应用[J];桥梁建设;2006年S1期
3 潘江波;陈正锦;宁英杰;;钢护筒施工质量问题原因分析和处理办法[J];交通标准化;2009年11期
4 韦相云;陈明;;深水桩基钢护筒的检测和钻孔问题处理[J];青海交通科技;2010年S1期
5 王凯;;钻孔灌注桩钢护筒振沉施工工艺[J];安徽建筑;2010年04期
6 陈玲;穆保岗;汪梅;陈力;;考虑钢护筒效应变截面桩竖向承载力研究[J];江苏建筑;2010年04期
7 王富颉;谢研;江锡华;;φ4.1m超大直径厚壁钢护筒制作[J];桥梁建设;2010年S1期
8 蔡志坚;吕为昱;谢研;;φ4.1m超大直径钢护筒插打施工技术[J];桥梁建设;2010年S1期
9 谢建花;宁艳玲;;椒江二桥钢护筒平台施工技术[J];城市道桥与防洪;2011年06期
10 自杰;;椒江二桥主塔桩基钢护筒施沉技术[J];城市道桥与防洪;2011年08期
相关会议论文 前10条
1 顾元威;;海上成孔钢护筒的优化设计[A];第十四届全国探矿工程(岩土钻掘工程)学术研讨会论文集[C];2007年
2 刘宇峰;黄国忠;赖学海;郑敏;;槟城二桥主桥钢护筒施工技术[A];第四届全国钢结构工程技术交流会论文集[C];2012年
3 郑海涛;张琦;王建勋;;跨海大桥钢护筒沉放施工工艺研究[A];第二届全国地下、水下工程技术交流会论文集[C];2011年
4 谭清明;吴湘明;夏雨成;;深水大流速河流中钢护筒的埋设技术[A];二○○○年湖北省桥梁学术讨论会论文集(上册)[C];2000年
5 王君;欧阳效勇;张先武;吴正安;;武汉军山大桥主5号墩钻孔桩钢护筒定位架设计[A];中国公路学会桥梁和结构工程学会一九九九年桥梁学术讨论会论文集[C];1999年
6 丁飞;刘圣伟;徐群;;军山大桥主6#墩钢护筒定位架制安技术[A];二○○○年湖北省桥梁学术讨论会论文集(上册)[C];2000年
7 李其修;丁焕林;;丹江口二桥水下切割施工[A];救捞专业委员会2004年学术交流会论文集[C];2004年
8 王君;任回兴;张先武;吴正安;;军山大桥主5~#墩钻孔桩钢护筒定位架设计[A];二○○○年湖北省桥梁学术讨论会论文集(上册)[C];2000年
9 李洪松;曹志毛;;城市桥梁桩基利用钢护筒跟进穿透流砂层施工技术[A];2012年全国桥梁技术交流会论文集[C];2012年
10 谭晶辉;;钢护筒加固技术在盾构接收井中的应用[A];2014中国城市地下空间开发高峰论坛论文集[C];2014年
相关重要报纸文章 前10条
1 曾正贤 刘志强;虎口拔牙[N];中国铁道建筑报;2008年
2 本报记者 向杰;张鸿:“我喜欢这种挑战”[N];科技日报;2007年
3 驻浙记者 万润龙 蒋萍 通讯员 莫云;嘉兴一钻井工被困海底逾60小时[N];文汇报;2010年
4 记者 岳德亮;东海海底救生记[N];新华每日电讯;2010年
5 杨健;科研攻关在苏通大桥上[N];解放日报;2008年
6 通讯员 张佳郁 刘双喜 郭永伟 席强 黄杰;挖潜增效各有实招[N];中国交通报;2010年
7 本报记者 徐小杰 通讯员 陈宗兴;闽侯:扎实推进项目建设[N];福州日报;2011年
8 本报记者 阎友华 特约通讯员 陈同尧 朱丽;冲击世界纪录[N];中国经济导报;2005年
9 本报记者 罗京;生死关头 坦然应对[N];长江日报;2010年
10 通讯员 余中国;杭州江东大桥提前完成主栈桥施工任务[N];人民铁道;2006年
相关硕士学位论文 前7条
1 夏熙;大水位差码头钢护筒与钢筋混凝土桩的水平受力特性分析[D];重庆交通大学;2014年
2 于黎;钢护筒钢筋混凝土桩大水位差深水码头结构力学性能试验研究[D];重庆交通大学;2014年
3 黄茂生;深厚软土地基上沉拔钢护筒机理研究[D];北京交通大学;2008年
4 李维洲;跨海大桥大型深水基础施工技术研究[D];长安大学;2008年
5 胡静;大直径钻孔灌注桩卵石层施工技术研究[D];河北工程大学;2013年
6 李泉源;基于钢护筒的钢筋混凝土桩大水位差码头横向排架可靠度分析[D];重庆交通大学;2014年
7 万朝栋;增建襄渝Ⅱ线铁路七里沟大桥深水基础施工技术与管理[D];天津大学;2012年
,本文编号:1642900