帷幕灌浆在西藏阿涡夺水库大坝基础防渗处理中的应用
本文选题:粘土心墙 + 堆石坝 ; 参考:《吉林大学》2014年硕士论文
【摘要】:阿涡夺水库位于西藏自治区隆子县境内,隆子河左岸支流。大坝坝基存在及其复杂特殊的地质条件,其坝基岩层顺河向、倾角陡、有着极为发育的张开性节理裂隙,产状多变,且风化破碎带埋深较大[1]。基于以上客观因素,为满足下游灌溉需要,结合实际渗水情况,先后两次对大坝进行帷幕灌浆。由于其复杂地质条件2003年的第一期帷幕灌浆并未取得良好的防渗效果。本文将重点解析后期的补强帷幕灌浆阶段。经过多次试验研究与实地考察,最终确定了“以堵为主,堵灌结合”的可控补灌基本施工方案及其对该类型地质条件的作用效果。根据实地情况,参照现行的水利水电相关规范,在施工方案中采用了在国际上较为先进灌浆理念和GIN灌浆法。2007年5月在大坝左坝肩进行了试现场补强灌浆试验,取得了不错的效果。之后又先后进行了主河床段、左岸山体、右岸平硐的帷幕补强灌浆和副帷幕补强灌浆,并对右坝肩采用高压旋喷灌浆和针对输水洞的“密封圈”帷幕灌浆等主要工作。经过了历时三年的努力整个大坝基础防渗补强工程基本结束。最终检查孔取芯率90%以上,RQD值为15~50%,岩体节理裂隙发育,节理多数张开,表面见铁锰质浸染,水泥结石充填于节理裂隙中,孔壁稳固。主河床段及右岸平洞部位检查孔压水透水率97%以上孔段小于10Lu,,为合格检查孔。个别孔段出现的稍大于10Lu的情况,在其两侧补充检查,补充孔检查结果为,透水率小于10Lu,说明该部位透水率稍高为极个别孤立现象,并不存在集中渗漏通道。[2]最终制定的补强帷幕灌浆设计方案在阿涡夺水库大坝坝基防渗处理施工中起到了很好的效果。 本次补强帷幕灌浆在阿涡夺水库防渗工作中的成功应用满足了水库下游藏民灌溉取水需要,也为本地区或类似地质条件的水利工程基础防渗处理提供了参考依据。
[Abstract]:Avoudou Reservoir is located in Longzi County, Tibet Autonomous region, the left bank of the Longzi River tributaries.The dam foundation exists and its complex special geological conditions. The rock layer of the dam foundation is along the river direction, steep dip, has extremely developed open joint fissure, the occurrence is changeable, and the weathering broken zone buries the depth is big [1].Based on the above objective factors, in order to meet the demand of downstream irrigation, combined with the actual seepage situation, the curtain grouting of the dam was carried out twice in succession.Because of its complicated geological conditions, the first stage of curtain grouting in 2003 did not achieve good seepage control effect.This paper will focus on the later stage of reinforcement curtain grouting stage.After many experiments and field investigations, the basic construction scheme of controlled supplementary irrigation and its effect on this type of geological conditions have been determined, which is based on plugging and combining plugging and irrigation.According to the actual situation and referring to the relevant codes of water conservancy and hydropower, the advanced grouting concept and GIN grouting method are adopted in the construction scheme. In May 2007, the site reinforcement grouting test was carried out on the left abutment of the dam.Good results have been achieved.After that, the curtain reinforcement grouting and the auxiliary curtain reinforcement grouting of the main river bed section, the left bank mountain body, the right bank adit and the right dam abutment were carried out successively, and the main work such as the high pressure rotary grouting and the "sealing ring" curtain grouting for the water conveyance tunnel were carried out.After three years of efforts, the whole dam foundation seepage reinforcement project is basically over.At last, the RQD value of 90% or more holes is 15 ~ 50, the joints of rock mass are developed, the majority of joints are open, the surface is stained with iron and manganese, the cement stone is filled in the joint fissure, and the wall of the hole is firm.The hole pressure and water permeability of the main river bed section and the right bank of the flat hole are less than 10 Lu. it is qualified to check the hole.In the case of a little larger than 10Lu in some pore segments, the supplementary inspection on both sides of the hole shows that the water permeability is less than 10 Lu. which indicates that the high permeability of this part is a very isolated phenomenon.There is no centralized seepage channel. [2] the final design scheme of reinforcement curtain grouting has played a very good role in the seepage control construction of the dam foundation of the Awangzhao reservoir.The successful application of the reinforcement curtain grouting in the impervious work of the Awangdou Reservoir meets the needs of the reservoir downstream Tibetans for irrigation and water intake, and also provides a reference basis for the basic seepage prevention treatment of water conservancy projects in this area or similar geological conditions.
【学位授予单位】:吉林大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:TV543.5
【相似文献】
相关期刊论文 前10条
1 姚明辉,李焰;三峡大坝帷幕灌浆特殊情况处理[J];红水河;2003年04期
2 李英杰;;帷幕灌浆频率及其累计曲线图绘制实例[J];工程地质计算机应用;2003年03期
3 王贵生,董桂华;岩体裂隙对帷幕灌浆的影响[J];东北水利水电;2004年05期
4 周彩贵,曹必正;天生桥水库山体防渗底层帷幕灌浆设计优化[J];西部探矿工程;2004年07期
5 宋玉国;何小松;强万毅;;溶岩地区大范围串通段高压帷幕灌浆的施工探讨[J];地质装备;2005年04期
6 侯锦;陈雁鸿;李磊;;紫坪铺水利枢纽工程深孔帷幕灌浆及特殊情况处理[J];探矿工程(岩土钻掘工程);2005年S1期
7 蒋玉水,赵庆贵;帷幕灌浆技术在天平湖改建工程中的应用[J];山东水利;2005年03期
8 郑国萍,黄少梅;特殊地质条件下的帷幕灌浆施工[J];西部探矿工程;2005年06期
9 姚惠丽;;大坝基岩帷幕灌浆技术的应用[J];中国西部科技;2006年01期
10 徐庆伟;;紫坪铺水利枢纽工程帷幕灌浆施工[J];四川水力发电;2006年01期
相关会议论文 前10条
1 张正武;;居甫渡水电站帷幕灌浆施工方案改进及技术应用[A];贵州省岩石力学与工程学会2010年学术年会论文集[C];2010年
2 童胜利;周胜成;;乐滩水电站Ⅰ标工程的帷幕灌浆施工[A];第三届广西青年学术年会论文集(自然科学篇)[C];2004年
3 李占华;张德顺;高占魁;;浅谈帷幕灌浆的施工方法[A];山东水利学会第十届优秀学术论文集[C];2005年
4 侯锦;陈雁鸿;李磊;;紫坪铺水利枢纽工程深孔帷幕灌浆及特殊情况处理[A];第十三届全国探矿工程(岩土钻掘工程)学术研讨会论文专辑[C];2005年
5 宋玉国;何小松;;溶岩地区大范围串通段高压帷幕灌浆的施工探讨[A];第八次水利水电地基与基础工程学术会议论文集[C];2006年
6 赵小毛;傅题善;闫德强;;长江三峡二期工程帷幕灌浆施工特殊情况原因分析及处理措施[A];山东水利科技论坛2006[C];2006年
7 马善才;;长江三峡水利枢纽二期厂坝工程帷幕灌浆设计与施工概要[A];2002年水利水电地基与基础工程学术会议论文集[C];2002年
8 代云;;隔河岩工程高压帷幕灌浆施工及质量控制[A];'98水利水电地基与基础工程学术交流会论文集[C];1998年
9 冯辉;郑文华;;托口红层岩溶地基常规帷幕灌浆施工技术研究[A];2013水利水电地基与基础工程技术——中国水利学会地基与基础工程专业委员会第12次全国学术会议论文集[C];2013年
10 仇道健;;小浪底4号灌浆洞帷幕灌浆施工质量控制措施[A];岩土钻掘技术在资源、环境和工程建设中的应用与发展学术论文集[C];2001年
相关重要报纸文章 前2条
1 本报通讯员;溪洛渡水电站开始帷幕灌浆[N];凉山日报(汉);2010年
2 曹兴山 (作者系甘肃省地矿局水勘院高工);坝基防渗处理中的帷幕灌浆法[N];地质勘查导报;2007年
相关博士学位论文 前1条
1 ABDULHAKIM GHALEB HASSAN AL-KHULAIDI(哈桑);土石坝帷幕灌浆技术及数值模拟[D];吉林大学;2013年
相关硕士学位论文 前7条
1 韩二品;新工艺帷幕灌浆的施工管理与综合评价研究[D];长沙理工大学;2013年
2 唐平;深孔帷幕灌浆技术参数研究[D];中国地质大学;2010年
3 刘三虎;岩溶地区帷幕灌浆研究[D];吉林大学;2004年
4 李鹏;大坝心墙基础先帷幕灌浆再爆破开挖施工方法的研究[D];西安理工大学;2007年
5 高祖纯;岩溶地区高压帷幕灌浆试验研究[D];四川大学;2003年
6 姜楠;帷幕灌浆在西藏阿涡夺水库大坝基础防渗处理中的应用[D];吉林大学;2014年
7 杨绍平;紫坪铺水库废弃煤洞防渗灌浆施工技术研究[D];重庆大学;2008年
本文编号:1734691