基于BIM与MVD的混凝土坝施工仿真模型信息处理研究
本文选题:建筑信息模型 + 模型视图定义 ; 参考:《水电能源科学》2017年06期
【摘要】:混凝土坝施工仿真过程中,为实现各专业的协同工作,会出现信息存储冗余及信息交互标准不统一等问题,从而影响模型的互操作性,降低了工作效率。为此,提出了基于建筑信息模型(BIM)与模型视图定义(MVD)的混凝土坝施工仿真模型,将信息交付手册(IDM)中的信息交互需求按IFC数据格式表达出来,以模块化的形式描述各个概念,确保了语义与逻辑的一致性,从而提高了模型信息的可读性。
[Abstract]:In the process of concrete dam construction simulation, in order to realize the cooperative work of various specialties, the problems of information storage redundancy and information exchange standard disunity will appear, which will affect the interoperability of the model and reduce the working efficiency.Therefore, a concrete dam construction simulation model based on building information model (BIM) and model view definition (IFC) is proposed. The information interaction requirements in the information delivery manual (IDM) are expressed according to the IFC data format, and each concept is described in modular form.The consistency of semantics and logic is ensured, and the readability of model information is improved.
【作者单位】: 天津大学水利工程仿真与安全国家重点实验室;
【分类号】:TP391.9;TV544
【相似文献】
相关期刊论文 前10条
1 邱世明,王仁超,顾培亮;混凝土坝施工管理决策支持系统[J];天津大学学报;2002年03期
2 郭佳乐;杜志达;;混凝土坝施工过程仿真研究[J];水利与建筑工程学报;2011年06期
3 朱伯芳;王同生;;混凝土坝施工中相邻坝块高差的合理控制[J];水利学报;1962年05期
4 朱光熙,苑克论;门、塔机——栈桥浇筑混凝土坝施工过程的计算机模拟[J];水利水电技术;1990年06期
5 周厚贵;戴志清;张开广;孙昌忠;曹生荣;;混凝土坝施工模拟研究现状与展望[J];三峡大学学报(自然科学版);2014年03期
6 姜袁,黄达海;混凝土坝施工过程仿真分析若干问题探讨[J];武汉水利电力大学学报;2000年03期
7 解文海;姚艳波;;论水利水电工程混凝土坝施工技术[J];现代商贸工业;2013年09期
8 李韦城;;混凝土坝施工[J];企业科技与发展;2010年06期
9 周厚贵;曹生荣;王泉德;;虚拟现实环境下的混凝土坝施工管理与决策[J];中国工程科学;2010年09期
10 黄建和;混凝土坝施工缝的处理及其特性[J];水利水电快报;1994年04期
相关博士学位论文 前1条
1 卞小草;混凝土坝施工进度仿真建模与方案优选[D];武汉大学;2014年
相关硕士学位论文 前5条
1 郭佳乐;混凝土坝施工过程仿真研究[D];大连理工大学;2011年
2 梁海俊;混凝土坝施工进度和成本的挣值分析研究[D];大连理工大学;2014年
3 欧阳和平;关门岩水电站碾压式混凝土坝施工工艺及质量控制[D];湖南农业大学;2011年
4 丁世来;混凝土坝施工过程仿真及浇筑块排序方法研究[D];武汉大学;2004年
5 李宁;基于BIM与IFC的混凝土坝施工仿真信息模型构建方法研究[D];天津大学;2012年
,本文编号:1742876
本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/1742876.html