济南卧虎山水库供水线路改造工程隧洞建设项目进度管理研究
本文选题:项目进度计划 + 计划优化 ; 参考:《中国海洋大学》2015年硕士论文
【摘要】:进度管理是工程实施过程中的重要内容,其目标在于保障工程项日按照预设目标保质、保量的如期完工:良好的进度管理应建立在一个切实可行的项目进度计划之上,好的进度计划必须准确可行,从而使管理者清晰了解项目建设实施中所要经历的每个环节。在一项工程设施建设当中良好的进度管理可以有效降低项目运行成本,提升项目的经济效益。本文以济南卧虎山水库供水线路改造工程隧道建设项目作为研究对象,运用进度管理知识对拟建项目进行分析、阐述。研究过程中依据该建设项目合同要求制定了先期进度计划,随后通过对工程承建单位人员、技术、物资及项目未知风险与不可测因素的综合考评,进一步优化了原计划中涉及的人员、技术、物料配给等方面的各项指标,通过规范制度对项目活动实施动态的进度控制,同时依据项目中预计风险均衡分配各项资源,保持平衡配比,保障项目顺利实施。基于对济南卧虎山水库供水线路改造工程隧道洞建设项目一线实地数据的搜集整理,通过对项目甘特图观测、关键路线工作分解检查等数据实测后,经挣值法计算得出工程中存在进度延迟现象,提出了利用改善组织关系、调整关键路线及调整工作关系等方法进行进度优化,并根据项目时限合理制定资源分配计划,提出项目“静态计划、动态控制”的进度管理方法。
[Abstract]:Schedule management is an important content in the process of project implementation. Its goal is to ensure that the project will be completed on time according to the preset objectives and quality. Good schedule management should be based on a feasible project schedule. A good progress plan must be accurate and feasible so that managers can clearly understand every aspect of project implementation. Good schedule management in a project can effectively reduce the cost of running the project and improve the economic efficiency of the project. Taking the tunnel construction project of the water supply line reconstruction project of Huhushan Reservoir in Jinan as the research object, this paper analyzes and expounds the proposed project by using the knowledge of schedule management. In the course of the study, according to the requirements of the construction project contract, the advance progress plan was made, and then the comprehensive evaluation of the personnel, technology, materials and unknown risk and unmeasurable factors of the construction unit was carried out. It further optimizes the indexes of personnel, technology, material ration and so on involved in the original plan, implements the dynamic progress control of the project activity through the standard system, and allocates the resources according to the expected risk in the project, at the same time, Maintain balanced matching to ensure the smooth implementation of the project. Based on the collection and collation of the field data of the tunnel and tunnel construction project of the water supply line reconstruction project of the Huhushan Reservoir in Jinan, and through the observation of the Gantt chart of the project and the inspection of the work breakdown of the key route, Through the calculation of earned value method, it is found that there is a delay in the progress of the project. The methods of improving the organization relationship, adjusting the key route and adjusting the working relationship are put forward to optimize the progress, and the resource allocation plan is made according to the time limit of the project. This paper puts forward the schedule management method of project "static plan, dynamic control".
【学位授予单位】:中国海洋大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TV554;TV511
【参考文献】
相关期刊论文 前10条
1 潘广钦;;项目进度管理研究综述[J];价值工程;2014年31期
2 郭亮;;探究水利工程施工项目造价管理与控制[J];金融经济;2014年18期
3 董军;冯天天;南晓红;;基于SD的资源约束型工程项目群进度管理研究[J];陕西电力;2014年09期
4 赵烨岑;;建筑企业项目的成本管理与控制[J];管理观察;2014年26期
5 汤鹏;强媈;;工程项目成本计划与控制系统分析[J];经营管理者;2014年23期
6 任魁;;论项目管理中的项目计划[J];现代营销(下旬刊);2014年06期
7 程秋霞;;探究水利工程施工项目经济管理与控制方式探索[J];中小企业管理与科技(下旬刊);2014年06期
8 方月;谢跃文;;项目计划与控制研究综述[J];中国建设信息;2013年20期
9 程德强;;浅论水利工程项目建设施工质量控制管理[J];中国水运(下半月);2013年04期
10 贾琼琼;;浅论工程项目计划的制定与控制[J];中国建设信息;2011年07期
相关硕士学位论文 前10条
1 郭玉国;秦皇岛万科假日风景项目进度管理研究[D];中国地质大学(北京);2013年
2 岳军;高校工程项目进度管理研究[D];中国地质大学(北京);2013年
3 肖寒;变电改造工程项目进度管理评价研究[D];华北电力大学;2013年
4 陈玉;南水北调廊涿干渠延长线工程项目施工管理研究[D];华北电力大学;2013年
5 王林芳;基于关键链技术的项目进度管理研究[D];西华大学;2013年
6 宋久乐;基于关键链技术的轨道交通建设项目进度管理研究[D];河南工业大学;2013年
7 汪若洋;项目进度管理方法及其应用研究[D];解放军信息工程大学;2013年
8 陈彦;基于WBS的220千伏花庄输变电工程项目进度管理研究[D];华北电力大学;2013年
9 王浩勤;基于关键链的R研究院A科研项目进度管理研究[D];电子科技大学;2013年
10 钟年节;湘核应指中心项目进度管理研究[D];中南大学;2012年
,本文编号:1857735
本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/1857735.html