当前位置:主页 > 科技论文 > 水利工程论文 >

大型水电站建设影响区的城镇体系规划调整研究

发布时间:2018-05-15 22:45

  本文选题:城镇体系 + 移民安置 ; 参考:《水力发电》2017年09期


【摘要】:大型水电站建设影响区的城镇体系重构是一种外力推动下的非常规突变,采用常规方法调整城镇体系规划具有局限性。以白鹤滩水电站建设影响区作为研究案例,将移民安置规划与城乡规划结合,从移民安置规划出发,探索针对此类型区的实用高效的城镇体系规划调整方法。进一步,此方法还可一般化推广至大型移民工程区域、灾后重建区等具有城镇体系突变特征的区域。
[Abstract]:The reconstruction of urban system in the area affected by the construction of large hydropower stations is a kind of unconventional mutation driven by external forces, and it is limited to adopt the conventional method to adjust the planning of urban system. Taking the construction impact area of Baihetan Hydropower Station as a case study, combining resettlement planning with urban and rural planning, this paper explores a practical and efficient method of urban system planning adjustment for this type of area from the perspective of resettlement planning. Furthermore, the method can also be generalized to areas with abrupt changes in urban system, such as large migration engineering areas and post-disaster reconstruction areas.
【作者单位】: 中国电建集团华东勘测设计研究院;
【分类号】:TU984;TV741


本文编号:1894305

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/1894305.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户e1531***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com