高海拔西藏旁多水利枢纽工程TBM监测维护与刀具损耗规律研究
发布时间:2018-06-16 04:12
本文选题:TBM + 刀具磨损 ; 参考:《石家庄铁道大学》2014年硕士论文
【摘要】:随着我国地铁、铁路、水利等基础设施大规模的建设,有着大量的大长隧道需要建设。TBM施工技术以快速、安全、环保等优势,逐渐成为越来越多的隧道工程的主要施工方式之一。TBM的步进方案、刀具的磨损、在线监测以及设备的维护保养等内容的研究对TBM的施工效率的提高,节约施工成本有着重要的意义。 西藏旁多水利枢纽工程是国内乃至世界上,第一个将TBM施工应用于海拔高度大于4000m的工程。本论文以该工程为背景,对工程当地的地质资料进行了分析,在现场记录了刀具损耗的相关数据,通过对这些数据进行数理统计分析,对TBM刀具磨损、损耗规律进行了研究;另外,笔者在现场参与TBM组装、调试、步进及施工等相关工作,,对TBM的步进方案、在线监测系统及设备的维护保养等方面又做了较为深入的研究。 本文研究表明,在IV类围岩条件下,不同的岩性的岩石对于刀具的磨损情况也是大有不同的。在岩石较硬的砂岩洞段,刀具的磨损较大,而在岩石相对较软的炭质页岩洞段,刀具的磨损就相对较小。另外,在同类岩石的洞段,各刀位刀具的磨损还与滚刀距离刀盘中心的位置有关,即距刀盘中心越远刀具磨损量越大。此外,通过对本工程TBM步进方案的研究,提出了本工程条件下的TBM步进的优化方案。通过对在线监测及设备维护保养等方面的研究,研究在线监测监测设备的参数及传感器布置的位置,总结出针对于本工程的维护保养规程,对于工程的后期施工及类似工程的故障监测诊断及保养也有一定的参考价值。
[Abstract]:With the large - scale construction of the infrastructure such as the subway , railway and water conservancy in our country , there are a lot of large - length tunnels to be constructed . TBM construction technology has become one of the main construction methods of more and more tunnel projects with the advantages of rapid , safe and environmental protection . The construction efficiency of TBM is greatly improved by TBM ' s stepping scheme , tool wear , on - line monitoring and maintenance and maintenance of equipment , and the construction cost is saved .
Based on the project , this paper analyzes the geological data of the project and records the relevant data of the tool loss in the field . Through the mathematical statistics analysis of these data , the wear and loss laws of TBM cutters are studied .
In addition , in the field of TBM assembly , debugging , stepping and construction , the author further studied the step scheme , on - line monitoring system and maintenance and maintenance of TBM .
In this paper , it is shown that under the condition of Class IV surrounding rock , the rock of different lithology is different for the wear of cutters . In the hard sandstone tunnel segment , the wear of cutters is relatively small . In addition , the tool wear is relatively small in the rock tunnel segment of relatively soft rock . In addition , through the research on the TBM stepping scheme of the project , the paper studies the parameters of the online monitoring and monitoring equipment and the location of the sensor arrangement , summarizes the maintenance and maintenance procedures for the project , and has some reference value for the later construction of the project and the fault monitoring and diagnosis and maintenance of similar projects .
【学位授予单位】:石家庄铁道大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:TV534;TG71
【参考文献】
相关期刊论文 前10条
1 刘宁宁;李正;;海拔2000m以上的低气压条件对电子产品安全性能的影响[J];安全与电磁兼容;2008年01期
2 杨媛媛;黄宏伟;;围岩分类在TBM滚刀寿命预测中的应用[J];地下空间与工程学报;2005年05期
3 王旭;李晓;廖秋林;;岩石可掘进性研究的试验方法述评[J];地下空间与工程学报;2009年01期
4 茅承觉,刘友元;隧洞掘进机盘形滚刀滚压岩石的试验[J];工程机械;1985年03期
5 田少民;工程机械的状态监测与故障诊断技术[J];工程机械;2001年01期
6 甄胜祥;李理;徐广辉;江健;;高原型工程机械散热系统的改进与应用[J];工程机械;2009年03期
7 郑智;许翔;靳尚杰;;高原地区对液压工程机械的影响及应对策略[J];工程机械与维修;2010年02期
8 陈开运;高海拔电气设备工作特点及设计要求[J];机车电传动;2005年02期
9 熊文辉;;铁路大型养路机械液压系统设计的新思路[J];机床与液压;2006年07期
10 刘宏志;;TBM及盾构机设备状态监测与故障诊断实用技术综述[J];隧道建设;2007年06期
本文编号:2025239
本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/2025239.html