  本文选题:库区 + 施工场地 ; 参考:《水力发电》2016年10期


【摘要】:长河坝水电站地处高山峡谷区,区内地质、地形条件较差,工程区内支沟多为泥石流沟,可供利用的场地主要在坝址下游。坝址下游场地位于下游梯级黄金坪水电站库区内,施工布置制约因素较多,布置困难。在施工总布置规划过程中根据工程的实际情况,将位于黄金坪水电站水库区内的场地提前进行垫高防护后使用,并对场地有影响的泥石流沟采取了防护措施。目前工程施工接近尾声,施工布置较好地满足了施工需要。
[Abstract]:Changheba Hydropower Station is located in the high mountain canyon area with poor geological and topographic conditions. The branch gullies in the engineering area are mostly debris flow gullies, and the sites available for utilization are mainly in the downstream of the dam site. The downstream site of the dam is located in the reservoir area of the downstream cascade Jinping Hydropower Station. The construction layout is restricted by many factors and is difficult to arrange. According to the actual situation of the project, the site located in the reservoir area of Jinping Hydropower Station is used after the cushion height protection in advance, and the protective measures are taken on the debris flow ditch which has influence on the site. At present, the construction of the project is nearing the end, and the construction arrangement meets the construction needs well.
【作者单位】: 中国电建集团成都勘测设计研究院有限公司;
【分类号】:TV511

【相似文献】

相关期刊论文 前10条

1 傅威文;;水利工程施工布置方案的影响因素分析[J];硅谷;2009年09期

2 王涛;宫继仁;;水利工程施工布置方案的影响因素分析[J];中国新技术新产品;2010年04期

3 白玉杰;王艳;邓庆涛;袁宝玮;;水利工程施工布置方案的影响因素分析[J];硅谷;2011年04期

4 张春东;;水利工程施工布置方案的影响因素分析[J];科技资讯;2011年35期

5 金化斌;赵庆峰;孙廷胜;;水利工程施工布置规划的原则及主要要求[J];科技视界;2013年26期

6 黄忷岱;;水利水电工程施工布置及其优化[J];现代物业(上旬刊);2012年07期

7 于龙;王振海;;水利水电工程施工布置[J];黑龙江科技信息;2011年20期

8 马平均;桃林口水库右岸工程施工布置[J];河北水利水电技术;1997年02期

9 胡志根,肖焕雄;水电工程施工布置方案多目标模糊优选决策研究[J];水电站设计;1997年02期

10 张晓光,张生忠;大桥水库混凝土拌和系统的施工布置与设计特点概述[J];四川水力发电;2000年04期

相关硕士学位论文 前1条

1 曾建平;水利水电工程施工布置及其优化[D];西安理工大学;2005年



本文编号:2074109

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/2074109.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户050d1***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com