混凝土坝非稳态施工过程异常监控与管理研究
发布时间:2018-06-30 21:57
本文选题:非稳态 + 施工过程 ; 参考:《计算机工程与应用》2017年20期
【摘要】:为有效管控混凝土坝非稳态施工过程,针对施工过程中施工资源的时变性造成施工计划变更频繁、施工进度难以保证等问题,首先对多域施工资源进行了统一形式化描述,定义了施工任务与施工资源之间的关联约束关系,然后对施工资源异常进行分类定义并建立了单源、多源随机资源异常事件的响应机制与传播算法,开发了可管控施工资源动态变化的施工过程管理原型系统,在某水电站主体工程施工过程中进行原型应用,取得了较好效果。该方法可作为施工仿真系统的有效补充用于水电工程施工过程管理。
[Abstract]:In order to effectively control the unsteady construction process of concrete dam, aiming at the problems such as frequent change of construction plan caused by time-varying of construction resources during construction process and difficulty in ensuring construction progress, the multi-domain construction resources are described in a unified formalized way. The relationship between construction task and construction resource is defined, then the anomaly of construction resource is classified and defined, and the response mechanism and propagation algorithm of single source, multi-source random resource anomaly event are established. The prototype system of construction process management which can control the dynamic change of construction resources is developed. The prototype is applied in the construction process of the main project of a hydropower station, and good results have been obtained. The method can be used as an effective supplement to the construction simulation system for the construction process management of hydropower projects.
【作者单位】: 湖北省水电工程施工与管理重点实验室(三峡大学);三峡大学机械与动力学院;
【基金】:湖北省水电工程施工与管理重点实验室开放基金(No.2014KSD11) 三峡大学人才科研启动基金(No.KJ2014B041) 宜昌市大学科学研究与应用项目(No.A16-302-a02) 国家自然科学基金面上项目(No.50945042)
【分类号】:TV544
【相似文献】
相关期刊论文 前4条
1 郑孝宇,褚君达,朱维斌;河网非稳态水环境容量研究[J];水科学进展;1997年01期
2 代应权;;水库施工过程中存在的问题及对策[J];黑龙江水利科技;2013年09期
3 晋良海;梁川;;龙滩电站施工资源无序挤占时最优限制补给研究[J];水力发电学报;2009年05期
4 秦世润;;浅谈工程项目施工过程中的风险控制[J];山西水利科技;2007年01期
,本文编号:2086978
本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/2086978.html