黄金坪水电站近居民区爆破施工方案研究
发布时间:2018-07-02 19:42
本文选题:尾水出口 + 边坡 ; 参考:《水力发电》2016年03期
【摘要】:黄金坪水电站尾水出口边坡爆破施工区域与姑咱镇水平距离仅110m。为避免爆破振动对当地居民及爆破冲击波对近距离建筑物造成伤害,围绕爆破振动、冲击波和飞石3大爆破公害,从施工环境分析入手,结合现场监测资料,摸索出一套有效的爆破负面效应防治和控制的技术措施,保证了工程安全,顺利完建。
[Abstract]:The horizontal distance between the blasting construction area of the tail water outlet slope of Jinping Hydropower Station and our town is only 110 m. In order to avoid the damage caused by blasting vibration to local residents and blasting shock wave to the near distance buildings, around blasting vibration, shock wave and flystone three big blasting pollution, starting from the construction environment analysis, combined with the site monitoring data, A set of effective technical measures for the prevention and control of blasting negative effects have been developed to ensure the safety of the project and the smooth completion of the construction.
【作者单位】: 中国水利水电第十四工程局有限公司;四川大唐国际甘孜水电开发有限公司;
【分类号】:TV542
,
本文编号:2090709