当前位置:主页 > 科技论文 > 水利工程论文 >

溪洛渡水电站坝基渗流监控模型与监测系统研究

发布时间:2018-07-03 19:35

  本文选题:大坝安全监测 + 渗压 ; 参考:《长江科学院》2017年硕士论文


【摘要】:近年来随着世界水电事业的飞速发展,水利工程的建设投资越来越高,工程规模十分巨大,修建的水工建筑物朝着“高、大”的方向发展。随着水利工程所面临的技术性难题越来越突出,工程安全问题也日益显著,大坝安全监测作为保障大坝安全运行的重要手段,具有重要意义。本文通过对溪洛渡大坝坝基渗流资料的分析,预测大坝坝基的渗压情况以及发展趋势,为大坝的安全运行提供依据。具体工作内容包括:(1)通过分析溪洛渡拱坝河床坝段和岸坡坝段渗压计的监测资料,并计算帷幕后渗压系数,监测资料分析成果表明:坝基渗压系数均小于溪洛渡拱坝设计值,表明溪洛渡水电站拱坝坝基帷幕防渗效果良好。(2)根据成因分析,将坝基渗压分解为水位分量、温度分量和时效分量,分别采用逐步回归与偏最小二乘回归方法建立坝基渗压监控模型,统计模型分析结果表明:两种方法建立的监控模型拟合效果均较好,符合坝基渗压变化规律的一般认识。监控模型显示水位分量占主导地位,而随着大坝由初蓄期进入运行期,时效分量逐渐减小。(3)溪洛渡安全监测资料管理及分析云服务软件系统(简称为安全监测系统)主要用途包括数据管理、资料分析、系统管理等。本文详细介绍了监测系统的使用说明,并将坝基渗压统计模型嵌入到大坝安全监测系统中,便于实时监控并及时预测坝基渗压的变化趋势。
[Abstract]:In recent years, with the rapid development of hydropower industry in the world, the construction investment of water conservancy project is more and more high, the project scale is very large, and the hydraulic structure is developing in the direction of "high and large". As the technical problems faced by water conservancy projects become more and more prominent, the problems of engineering safety are becoming more and more prominent. As an important means to ensure the safe operation of dams, dam safety monitoring is of great significance. Based on the analysis of seepage data of Xiluodu dam foundation, the seepage pressure of dam foundation and its development trend are predicted in this paper, which provides the basis for the safe operation of the dam. The main contents are as follows: (1) by analyzing the monitoring data of the seepage gauge in the river bed and bank slope of Xiluodu arch dam, and calculating the seepage coefficient behind the curtain, the results show that the seepage pressure coefficient of the dam foundation is smaller than the design value of the Xiluodu arch dam. The results show that the curtain of the arch dam foundation of Xiluodu Hydropower Station has a good anti-seepage effect. (2) according to the cause analysis, the seepage pressure of the dam foundation is decomposed into water level component, temperature component and aging component. Stepwise regression and partial least square regression are used to establish the monitoring model of seepage pressure of dam foundation. The results of statistical model analysis show that the two methods have good fitting effect and accord with the general understanding of the law of seepage pressure change of dam foundation. The monitoring model shows that the water level component is dominant, and as the dam moves from the initial storage period to the operational stage, (3) data management and analysis of security monitoring data in Xiluodu (referred to as security monitoring system) are mainly used in data management, data analysis, system management, etc. This paper introduces the usage of the monitoring system in detail, and embeds the statistical model of seepage pressure of dam foundation into the dam safety monitoring system, which is convenient for real-time monitoring and timely predicting the changing trend of seepage pressure of dam foundation.
【学位授予单位】:长江科学院
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TV698.1

【相似文献】

相关期刊论文 前10条

1 李旦江,储海宁;对大坝渗压监测中两个问题的看法[J];大坝与安全;2005年05期

2 曹健人;祁福环;;水管式渗压计研制报告[J];大坝观测与土工测试;1986年03期

3 葛祖立;为渗压计正名[J];大坝观测与土工测试;1995年06期

4 解红星;大梁水库7支渗压计仪器编号的鉴别及检验[J];山西水利科技;2002年03期

5 郑艳双;;渗压计的埋设[J];西部探矿工程;2006年S1期

6 陈鼎;用高抗渗性水泥砂浆封堵高压渗透试验渗压孔[J];水利水电技术;1997年07期

7 邵青,徐丽珊;非饱和环境对渗压计测值的影响[J];人民长江;1998年09期

8 王华;;连通器在大坝监测渗压计检验中的创新与应用[J];四川水力发电;2013年06期

9 李刚;宋先海;;渗压计在渗流监测中的误差分析及对策[J];人民长江;2010年15期

10 李江波;;株溪口水电厂损坏渗压计的修复[J];科技信息;2013年02期

相关会议论文 前1条

1 辛凤茂;高鹏伟;;穿黄隧洞工程F12断层基岩面内部差阻电动式渗压计施工技术应用[A];2012全国水工泄水建筑物安全与病害处理技术应用专刊[C];2012年

相关博士学位论文 前1条

1 吴永红;光纤光栅水工渗压传感器封装的结构分析与试验[D];四川大学;2003年

相关硕士学位论文 前2条

1 涂s,

本文编号:2094769


资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/2094769.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户06281***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com