超大型轴流转桨式水轮发电机组定子组装工艺
发布时间:2018-07-21 19:39
【摘要】:安谷水电站机组是超大型轴流转桨式水轮发电机组,定子机座散装运输到场,机座安装采用现场焊接方式。为克服机座尺寸大、质量重、当地温差大等定子安装精度的不利影响,介绍了定子机座焊接组装、定位筋安装调整、铁芯叠片和铁损试验等关键工序,并通过分析机组定子安装工艺和实践总结,优化了施工工序。实践证明定子组装质量得到严格控制,各项控制指标均满足规范标准,其安装工艺对同类型机组定子安装具有指导意义。
[Abstract]:Angu Hydropower Station unit is a super large shaft flow propeller type hydrogenerator unit, the stator seat is transported in bulk, and the installation of the base adopts the spot welding method. In order to overcome the adverse effects of large size, heavy weight and large local temperature difference on stator installation accuracy, the key processes such as stator seat welding assembly, positioning reinforcement installation and adjustment, iron core lamination and iron loss test are introduced. The construction procedure is optimized by analyzing the installation technology and practice of the stator. The practice proves that the quality of stator assembly is strictly controlled and all the control indexes meet the standard. The installation technology of stator assembly is of guiding significance for the stator installation of the same type of units.
【作者单位】: 中国水利水电第七工程局机电安装分局;河海大学水利水电学院;河海大学能源与电气学院;
【分类号】:TV547.3
[Abstract]:Angu Hydropower Station unit is a super large shaft flow propeller type hydrogenerator unit, the stator seat is transported in bulk, and the installation of the base adopts the spot welding method. In order to overcome the adverse effects of large size, heavy weight and large local temperature difference on stator installation accuracy, the key processes such as stator seat welding assembly, positioning reinforcement installation and adjustment, iron core lamination and iron loss test are introduced. The construction procedure is optimized by analyzing the installation technology and practice of the stator. The practice proves that the quality of stator assembly is strictly controlled and all the control indexes meet the standard. The installation technology of stator assembly is of guiding significance for the stator installation of the same type of units.
【作者单位】: 中国水利水电第七工程局机电安装分局;河海大学水利水电学院;河海大学能源与电气学院;
【分类号】:TV547.3
【相似文献】
相关期刊论文 前10条
1 陈瑞兴;;轴流转桨式机组三维检修仿真培训系统开发研究[J];水利科技与经济;2013年01期
2 梁政;;轴流转桨式水电机组作定桨运行[J];水电站机电技术;1990年03期
3 王志栋;水口水电站轴流转桨式转轮组装特点[J];水电站机电技术;1996年01期
4 李友松;温业雄;;昭平水电厂轴流转桨式机组运行中出现的问题及处理[J];红水河;2007年02期
5 丁凯;;轴流转桨式机组顶盖排水系统改造浅析[J];四川水力发电;2011年S2期
6 胡鑫凡;雷霆;秦留生;;乌江银盘水电站轴流转桨式水轮发电机组的安装监理质量控制[J];水利规划与设计;2012年01期
7 李友松;温业雄;;轴流转桨式转轮叶片漏油检修处理[J];小水电;2007年04期
8 叶伟东;;轴流转桨式水轮发电机组转轮排油阀密封结构改造[J];小水电;2007年05期
9 刘清勇;帅秀莲;陶红;;水口水电站200MW轴流转桨式水轮机转轮改造[J];电站系统工程;2010年04期
10 张文勤;;平班水电站轴流转桨式机组安装质量控制[J];水电站机电技术;2005年06期
相关会议论文 前3条
1 薛雪峰;刘三成;;轴流转桨式转轮叶片磨蚀处理[A];水轮发电机组稳定性技术研讨会论文集[C];2007年
2 陈瑞瑞;刘胜柱;冯建军;罗兴,
本文编号:2136645