当前位置:主页 > 科技论文 > 水利工程论文 >

水位变动较大河道环保疏浚与底泥处置方案

发布时间:2018-07-30 08:15
【摘要】:为解决水位变动较大河道的环保疏浚与底泥处置问题,基于山美水库进库河道段疏浚工程,总结如何合理地选择疏浚时机,采用适合特定水位下的疏浚设备统筹施工,利用太阳能自然干化降低底泥含水率,从而提高生产效率、节约成本,为后续工程提供经验借鉴。
[Abstract]:In order to solve the problem of environmental dredging and sediment disposal in river course with large water level change, based on the dredging project of Shanmei Reservoir, this paper summarizes how to select the dredging time reasonably, and how to use the dredging equipment suitable for the specific water level to carry out the dredging construction as a whole. The natural drying of solar energy is used to reduce the water content of sediment, which can improve the production efficiency, save the cost and provide experience and reference for the subsequent projects.
【作者单位】: 中交天津港航勘察设计研究院有限公司;
【分类号】:TV851

【相似文献】

相关期刊论文 前1条

1 冯莉;;环保疏浚工程质量控制分析[J];中国水运;2014年06期



本文编号:2154388

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/2154388.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户20ad8***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com