基于原型监测的黏土心墙堆石坝渗流分析
[Abstract]:During the water storage period of a clay core dam, the seepage volume is large, the seepage of the dam body increases, and the seepage around the dam increases. In order to find out the cause, the monitoring results of seepage flow, seepage pressure of dam foundation and seepage flow around dam are obtained by analyzing the monitoring data of environmental quantity, seepage flow around dam body, seepage flow around dam and seepage flow rate of a certain clay core wall dam. In order to further analyze the seepage source, the seepage flow is analyzed by model. The results show that the monitoring results are mutually verified and influenced by the reservoir water level, the water level is the main factor affecting the size and variation of the seepage discharge, and the rainfall is the secondary factor, among which, The influence of reservoir water level on seepage flow is mainly through both banks around the dam and then through the dam foundation. The influence of reservoir water level on seepage discharge is both immediate and persistent.
【作者单位】: 南瑞集团公司(国网电力科学研究院);
【分类号】:TV698.12
【相似文献】
相关期刊论文 前10条
1 孟永东,田斌,任德记;基于原型监测资料的拱坝温度场分析[J];三峡大学学报(自然科学版);2001年05期
2 肖汉江,李祖民;大坝加高试验温度应力仿真计算与原型监测对比分析[J];长江科学院院报;2002年S1期
3 邹世奎;沈慧;潘琳;;基于原型监测的三湾泄洪闸墩施工期开裂成因分析[J];水电自动化与大坝监测;2012年06期
4 于青云;;西霞院水利枢纽原型监测设计[J];河南水利;2002年03期
5 王荣喜;王维雅;乔业斌;赵雯;张文清;;水工建筑物高边墙结构减载作用的原型监测与分析[J];江淮水利科技;2008年03期
6 胡波;赵斌;;基于原型监测的特高拱坝坝肩接触带蓄水初期安全性态评价[J];水电自动化与大坝监测;2010年04期
7 王跟前;;超高精度TS30全站仪在坝体原型监测高程基准专用控制网中的试验研究[J];甘肃水利水电技术;2013年10期
8 胡波;刘观标;吴中如;;基于原型监测的小湾特高拱坝首蓄期坝基变形特性分析[J];水电自动化与大坝监测;2012年05期
9 刘大文;石板水电站大坝原型监测设计[J];四川水力发电;2000年04期
10 吴鹏举;;关于碾压混凝土坝原型监测设计一些问题的探讨[J];大坝观测与土工测试;1991年Z1期
相关会议论文 前1条
1 胡波;刘观标;吴中如;;基于原型监测及数值仿真试验的小湾特高拱坝首蓄期坝基变形特性研究[A];水库大坝建设与管理中的技术进展——中国大坝协会2012学术年会摘要文集[C];2012年