考虑过程干扰因素的引水工程工期成本仿真优化研究
[Abstract]:In view of the present situation of the construction of a large number of water diversion projects in China, and the fact that the construction project is disturbed by a large number of influential factors, the control of the project progress is greatly troubled. This paper studies the simulation optimization of the construction cost of water diversion project under the influence of process disturbance factors. On the basis of analyzing the present situation of the research on the preparation methods of the linear engineering schedule at home and abroad, the importance and characteristics of the preparation and optimization of the linear engineering schedule are clarified, and based on the theory of linear schedule planning, The main contents of this paper are as follows: firstly, the modification of the project schedule, the reasonable optimization of the construction scheme, and the optimization of the time limit and the cost under the influence of the process interference are studied. According to the uncertain characteristics of the process disturbance factors, the dynamic cycle optimization model of the water diversion project schedule based on the process interference factors is put forward in order to modify and optimize the schedule of the diversion project under the influence of the process disturbance factors, and according to the uncertain characteristics of the process interference factors, the dynamic cycle optimization model is proposed. The optimization idea takes into account the actual environmental factors as far as possible and improves the ability of water diversion engineering to optimize the schedule under the influence of interference factors. Aiming at the schedule optimization under the disturbance of specific events, this paper establishes a model, improves the existing LSM plan constraint system, and establishes a quantitative analysis of the LSM planning resource constrained duration optimization problem under the process interference factors. Combined with the interference factors in the construction process of a water diversion project, the simulation optimization calculation and analysis are carried out. Secondly, on the basis of solving the problem of optimal construction period of diversion project under the interference of process factors, the optimal cost of construction period is further considered from the perspective of the contractor, and the influence of the reward and penalty mechanism of owner on the optimization of construction cost is considered as well as the optimization of time cost. In order to solve this problem, a quantitative analysis model of time-cost equilibrium optimization problem is established, which is essentially a multi-objective optimization problem. In the optimization model, the possible construction mode and the reasonable cost corresponding to the different modes are defined for each construction operation of the construction project without construction. In the case of an operation affected by interference factors, By using the Pareto optimal frontier theory, some optimization schemes are obtained for the decision making of the contractor. In order to get the optimization result of this paper more efficiently, according to the established model, the solution program is written with the help of Matlab programming software. Combined with a large water transfer project, the optimization of the duration cost under the process interference is simulated and analyzed.
【学位授予单位】:华北水利水电大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TV67;TV51
【参考文献】
相关期刊论文 前10条
1 伊长生;孙妍妍;沈佳乐;高建炳;;多模式工期-成本均衡优化的模糊规划模型[J];项目管理技术;2016年12期
2 钟雁;董胜英;刘仍奎;张玲;;铁路建设工程进度计划优化模型研究[J];交通运输系统工程与信息;2015年05期
3 伊长生;高建炳;;基于模糊规划的工程项目工期—成本—质量均衡优化研究[J];工程管理学报;2015年01期
4 李明;李前进;邓海;;线性工程项目工期成本优化方法[J];石家庄铁道大学学报(社会科学版);2014年01期
5 陈红杰;;工期变化时CPM方法与LSM方法在线状工程中的适用性研究[J];项目管理技术;2013年02期
6 蒋根谋;熊燕;;线性计划方法及其应用研究[J];华东交通大学学报;2008年05期
7 杨耀红;汪应洛;王能民;;工程项目工期成本质量模糊均衡优化研究[J];系统工程理论与实践;2006年07期
8 王虎;陈韦伶;;基于挣值的进度费用控制应用[J];世界科技研究与发展;2006年01期
9 蒋根谋;一种新的线性工程项目进度计划的编制方法[J];铁道建筑;2005年11期
10 王健,刘尔烈,骆刚;工程项目管理中工期—成本—质量综合均衡优化[J];系统工程学报;2004年02期
相关博士学位论文 前2条
1 唐源洁;交通运输线性工程施工进度计划编制及优化方法研究[D];北京交通大学;2015年
2 蒋根谋;线状工程项目进度计划及资源分配问题优化研究[D];南昌大学;2008年
相关硕士学位论文 前7条
1 刘峰;线性计划方法(LSM)在高铁工程建设进度管理中的应用研究[D];华南理工大学;2016年
2 王攀科;长距离引水工程施工进度控制研究[D];华北水利水电学院;2012年
3 苏义拉;重复性建设项目中资源均衡问题的优化模型研究[D];华北电力大学;2012年
4 陈心路;资源约束重复性项目调度优化模型的应用研究[D];华北电力大学;2012年
5 李胜韬;白杨河电厂220kV送出工程进度控制及优化问题研究[D];华北电力大学(北京);2011年
6 朱晓璐;基于灰色斜率分析的资源受限项目调度问题研究与应用[D];重庆大学;2011年
7 童晶;多目标优化的Pareto解的表达与求取[D];武汉科技大学;2009年
,本文编号:2251617
本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/2251617.html