当前位置:主页 > 科技论文 > 水利工程论文 >

白鹤滩水电站全面开工

发布时间:2018-11-04 09:43
【摘要】:正2017年8月3日上午,全球在建规模最大的水电工程——金沙江白鹤滩水电站工地举行建设动员大会,标志着工程全面开工建设。白鹤滩水电站位于四川省宁南县和云南省巧家县境内,是金沙江下游干流河段四个水电梯级中的第二个梯级电站。其开发任务以发电为主,兼顾防洪,并有拦沙、发展库区航运和改善下游通航条件等综合利用效益,是西电东送骨干电源点之一。
[Abstract]:On the morning of Aug. 3, 2017, the largest hydropower project under construction in the world, the Paihetan Hydropower Station on the Jinsha River, held a construction mobilization conference, marking the full start of the project. Baihetan Hydropower Station, located in Ningnan County, Sichuan Province and Qiaojia County, Yunnan Province, is the second cascade of four hydropower stations in the lower reaches of the Jinsha River. The main task of its development is to generate electricity, take into account flood control, and have comprehensive utilization benefits such as developing shipping in the reservoir area and improving the conditions of navigation downstream, which is one of the key power supply points for the power supply from the west to the east.
【分类号】:TV752

【相似文献】

相关期刊论文 前10条

1 黄丽;;水电站枢纽工程区集镇的变迁——来自白鹤滩水电站的调查报告[J];三峡论坛(三峡文学.理论版);2012年04期

2 张成稳;曾厅余;宗德孝;居志刚;;白鹤滩水电站建设期气象保障服务思考[J];云南大学学报(自然科学版);2012年S2期

3 ;金沙江白鹤滩水电站开工[J];云南水力发电;2011年06期

4 ;白鹤滩水电站施工总布置规划复核报告通过审查[J];水利水电施工;2010年04期

5 金珍宏;;白鹤滩水电站运行期能耗指标计算分析[J];水利规划与设计;2013年04期

6 刘振中;黎细波;张婷;;半预制式界桩在白鹤滩水电站建设征地界桩测设中的应用[J];大坝与安全;2012年04期

7 于雷;;白鹤滩水电站明挖工程爆破降尘试验方案研究[J];科技与企业;2013年22期

8 金珍宏;;白鹤滩水电站施工期能耗量分析方法[J];水利水电技术;2012年11期

9 向欣;赵强;;白鹤滩水电站边坡稳定控制因素与破坏模式研究[J];水利水电技术;2013年11期

10 李新宇;陈炜e,

本文编号:2309458


资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/2309458.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户0a66c***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com