发布时间:2018-11-07 12:10
【摘要】:近年来,碾压混凝土重力坝在国内外得到了广泛运用,日渐成为一种流行坝型,得益于其具有施工安全、速度快、造价低等特点。碾压混凝土重力坝的温度场及温度应力场仿真分析一直是一项重要的研究课题,也是制定碾压混凝土重力坝合理温度控制措施的重要依据,具有重要的工程实践价值,因此开展这方面的研究十分必要。 本文以张家坡水库碾压混凝土重力坝为例,利用ANSYS软件建立了有限元仿真分析典型坝段(挡水坝段、溢流坝段)模型,采用ANSYS软件模拟计算了典型坝段施工期、过渡期的温度场及温度应力场。仿真模拟计算中,,考虑了不同的混凝土浇筑温度、不同施工间歇等因素对温度场及温度应力场的影响。本文主要研究工作如下: (1)利用ANSYS软件,建立张家坡水库碾压混凝土重力坝典型坝段(挡水坝段、溢流坝段)三维有限元仿真模型; (2)基于ANSYS平台,编制张家坡水库碾压混凝土重力坝典型坝段(挡水坝段、溢流坝段)温度场和温度应力场的APDL参数设计语言程序; (3)计算、分析张家坡水库挡水坝段在不同工况下,坝体施工期及过渡期中温度场、应力场的变化;以挡水坝段计算成果为基础,选出合理控制工况,对溢流坝段也进行了温度场、应力场的计算分析。采用合理控制工况作为施工推荐方案,研究成果用以指导实际工程的施工。
[Abstract]:In recent years, roller compacted concrete gravity dams have been widely used at home and abroad, and become a popular dam type day by day, thanks to its characteristics of safe construction, fast construction, low cost and so on. The simulation analysis of temperature field and thermal stress field of RCC gravity dam is always an important research subject, and also an important basis for formulating reasonable temperature control measures of RCC gravity dam, which has important engineering practical value. Therefore, it is necessary to carry out research in this field. Taking the RCC gravity dam of Zhangjiapo Reservoir as an example, the finite element simulation analysis model of typical dam segment (water retaining dam section, overflow dam section) is established by using ANSYS software, and the typical dam section construction period is simulated by ANSYS software. The temperature field and the temperature stress field in the transition period. In the simulation calculation, the influence of different pouring temperature and different construction interval on the temperature field and the temperature stress field is considered. The main research work of this paper is as follows: (1) using ANSYS software, the 3D finite element simulation model of typical RCC gravity dam section (water retaining section, overflow dam section) of Zhangjiapo reservoir is established. (2) based on the ANSYS platform, the APDL parameter design language program of the typical RCC gravity dam section (water retaining dam, overflow dam section) of Zhangjiapo Reservoir is compiled. (3) calculate and analyze the change of temperature field and stress field of Zhangjiapo reservoir during the construction period and transition period under different working conditions; Based on the calculation results of water retaining dam section, the reasonable control conditions are selected, and the temperature field and stress field of overflow dam section are calculated and analyzed. The research results are used to guide the construction of practical projects by adopting reasonable control conditions as the recommended construction scheme.
【学位授予单位】:郑州大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:TV642;TV315
本文编号:2316329
[Abstract]:In recent years, roller compacted concrete gravity dams have been widely used at home and abroad, and become a popular dam type day by day, thanks to its characteristics of safe construction, fast construction, low cost and so on. The simulation analysis of temperature field and thermal stress field of RCC gravity dam is always an important research subject, and also an important basis for formulating reasonable temperature control measures of RCC gravity dam, which has important engineering practical value. Therefore, it is necessary to carry out research in this field. Taking the RCC gravity dam of Zhangjiapo Reservoir as an example, the finite element simulation analysis model of typical dam segment (water retaining dam section, overflow dam section) is established by using ANSYS software, and the typical dam section construction period is simulated by ANSYS software. The temperature field and the temperature stress field in the transition period. In the simulation calculation, the influence of different pouring temperature and different construction interval on the temperature field and the temperature stress field is considered. The main research work of this paper is as follows: (1) using ANSYS software, the 3D finite element simulation model of typical RCC gravity dam section (water retaining section, overflow dam section) of Zhangjiapo reservoir is established. (2) based on the ANSYS platform, the APDL parameter design language program of the typical RCC gravity dam section (water retaining dam, overflow dam section) of Zhangjiapo Reservoir is compiled. (3) calculate and analyze the change of temperature field and stress field of Zhangjiapo reservoir during the construction period and transition period under different working conditions; Based on the calculation results of water retaining dam section, the reasonable control conditions are selected, and the temperature field and stress field of overflow dam section are calculated and analyzed. The research results are used to guide the construction of practical projects by adopting reasonable control conditions as the recommended construction scheme.
【学位授予单位】:郑州大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:TV642;TV315
【参考文献】
相关期刊论文 前10条
1 沈崇刚;中国碾压混凝土坝的发展成就与前景(上)[J];贵州水力发电;2002年02期
2 朱伯芳;在混合边界条件下非均质粘弹性体的应力与位移[J];力学学报;1964年02期
3 朱伯芳;关于“线性徐变问题的两个定理及对计算方法的简化”一文的讨论[J];力学学报;1995年06期
4 朱伯芳;多层混凝土结构仿真应力分析的并层算法[J];水力发电学报;1994年03期
5 朱伯芳,许平;碾压混凝土重力坝的温度应力与温度控制[J];水利水电技术;1996年04期
6 郝长福,花红亮,奚向军,王晓升;龙首水电站碾压混凝土大坝施工[J];水力发电;2001年10期
7 郭怀志;;力分配法解平面问题[J];水利学报;1964年01期
8 朱伯芳;混凝土结构徐变应力分析的隐式解法[J];水利学报;1983年05期
9 朱伯芳;弹性徐变体有限元分区异步长算法[J];水利学报;1995年07期
10 朱伯芳;不稳定温度场数值分析的分区异步长解法[J];水利学报;1995年08期