当前位置:主页 > 科技论文 > 水利工程论文 >

南水北调某工程施工土石方平衡及影响因素

发布时间:2018-12-15 01:21
【摘要】:针对南水北调工程某标段开工后受弃渣场和取土场移交的不确定性、工程地质条件变化、设计变更及技术要求的改变等外界干扰因素的综合影响,通过分析对比每个施工阶段的不同区别和新情况、新问题,合理地调整了土石方调配流向。在保证施工进度的前提下,以节约施工成本为最终目的,实现了机动灵活的土石方动态平衡。这为以后类似工程提供了成功经验。
[Abstract]:In view of the uncertainty of the disposal site and the transfer of the soil field after the construction of a certain section of the South-to-North Water transfer Project, the comprehensive influence of the external interference factors such as the change of the engineering geological conditions, the change of the design and the change of the technical requirements, etc. Through the analysis and comparison of different differences and new conditions in each construction stage, the new problems are analyzed and the flow direction of earthwork allocation is adjusted reasonably. On the premise of ensuring construction schedule, the dynamic balance of earth and rock is realized with the ultimate goal of saving construction cost. This provides a successful experience for similar projects in the future.
【作者单位】: 中国人民武装警察部队水电第二总队五支队;
【分类号】:TV541


本文编号:2379680

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/2379680.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户09c32***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com