混凝土重力坝渗压系数负值分析
发布时间:2018-12-24 09:41
【摘要】:坝基渗压系数是评价混凝土重力坝渗流安全的一项重要指标。针对某些混凝土重力坝帷幕后扬压力测点渗压系数出现负值这一异常情况,对其进行定性、定量及物理成因分析,并在传统渗压系数统计模型中考虑了渗流量这一影响因素,通过偏最小二乘法进行回归分析,分析结果表明:其负值成因主要是混凝土坝初期防渗帷幕防渗性能较好、坝基岩石渗透性较弱,以及大坝运行期较短,坝基渗流还没有达到一个稳态平衡状态所致。
[Abstract]:Seepage coefficient of dam foundation is an important index to evaluate seepage safety of concrete gravity dam. In view of the abnormal situation that the seepage coefficient of some concrete gravity dam behind the curtain is negative, the qualitative, quantitative and physical cause of formation is analyzed, and the influence factor of seepage flow is considered in the traditional statistical model of seepage pressure coefficient. The results of regression analysis by partial least square method show that the main causes of negative value are that the impervious curtain has good anti-seepage performance in the initial stage of concrete dam, the permeability of rock in dam foundation is weak, and the operation period of dam is short. The seepage of the dam foundation has not reached a steady equilibrium state.
【作者单位】: 西北农林科技大学水利与建筑工程学院;中国石油西气东输管道公司;中石化南京工程有限公司;黄河勘测规划设计有限公司;
【基金】:“十二五”国家科技支撑计划项目(2012BAD08B01)
【分类号】:TV223.4
本文编号:2390474
[Abstract]:Seepage coefficient of dam foundation is an important index to evaluate seepage safety of concrete gravity dam. In view of the abnormal situation that the seepage coefficient of some concrete gravity dam behind the curtain is negative, the qualitative, quantitative and physical cause of formation is analyzed, and the influence factor of seepage flow is considered in the traditional statistical model of seepage pressure coefficient. The results of regression analysis by partial least square method show that the main causes of negative value are that the impervious curtain has good anti-seepage performance in the initial stage of concrete dam, the permeability of rock in dam foundation is weak, and the operation period of dam is short. The seepage of the dam foundation has not reached a steady equilibrium state.
【作者单位】: 西北农林科技大学水利与建筑工程学院;中国石油西气东输管道公司;中石化南京工程有限公司;黄河勘测规划设计有限公司;
【基金】:“十二五”国家科技支撑计划项目(2012BAD08B01)
【分类号】:TV223.4
【相似文献】
相关期刊论文 前10条
1 秦俊德;陈村大坝坝基渗压问题的探讨[J];大坝与安全;1991年04期
2 郭澄平;钻孔多点渗压测量及压模系统[J];水力发电;1998年04期
3 邵凌峰;刘安宇;方朝阳;;富水水库坝基渗压水头测值变化规律分析[J];人民黄河;2013年11期
4 倪新铮;埋设在海子水库南副坝的水管式渗压仪[J];水利水电技术;1981年02期
5 张建海,何江达,范景伟;渗压对小湾坝肩岩体稳定性的影响[J];云南水力发电;2000年02期
6 宋汉周,江晓文;湖南镇大坝右坝肩渗压异常互渗控研究[J];水文地质工程地质;1996年06期
7 秦俊德;陈村大坝坝基渗压问题的探讨[J];华东电力;1989年06期
8 潘锦江;浅议水工建筑物的基底渗压系数[J];四川水力发电;2004年03期
9 马柏林;怀柔水库主坝渗压与沉陷观测资料浅析[J];北京水利;1998年03期
10 唐清华,曾国洪,周伟良;李溪拦河闸坝地基渗压监测数据分析[J];大坝与安全;2005年01期
相关会议论文 前1条
1 廖燕贻;;ZSY-1型钻孔渗压仪研制报告[A];三峡工程坝址区工程地质与岩石力学研究文集(上册)[C];1992年
相关博士学位论文 前1条
1 魏静;渗压作用下的有限应变固结理论研究[D];天津大学;2004年
,本文编号:2390474
本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/2390474.html