海港高桩码头结构维修技术应用
[Abstract]:Aiming at the optimization decision of structural maintenance technology of high pile wharf in harbor, by investigating the typical disease types of high pile wharf and combining with the applicable characteristics of various common maintenance methods, the requirements of maintenance technology for high pile wharf in marine environment are considered. Six kinds of maintenance technology combinations are put forward. According to the time, cost and guarantee time of each combination, the maintenance efficiency value is obtained, so as to make decision on the maintenance scheme. Finally, through the maintenance case of a wharf in Huizhou, the maintenance effect and economy of different technology combination are analyzed, and the correctness of maintenance scheme decision based on maintenance efficiency is verified.
【作者单位】: 中交四航工程研究院有限公司;
【基金】:交通运输建设科技项目(201332849A090)
【分类号】:U656.113
【相似文献】
相关期刊论文 前10条
1 董华钢;高桩码头设计按空间与平面计算方法的比较[J];水运工程;2001年09期
2 曹建明,崔步红,王笑难,朱崇诚,郑锋勇,李颖,张强;高桩码头检测评估内容的探讨[J];水道港口;2002年02期
3 丁乃庆,姚占龙;高桩码头结构锈蚀破损原因分析及对策[J];水道港口;2002年S1期
4 廖雄华,张克绪,王占生;岸坡开挖扰动对天津港高桩码头结构安全性影响的数值分析[J];中国港湾建设;2002年02期
5 陈宝珠,刘德友,郝健;高桩码头结构耐久性问题的探讨及应对方法浅议[J];中国港湾建设;2002年05期
6 朱锡昶,朱雅仙,葛燕,李岩;运行10年高桩码头腐蚀状况及特点[J];水运工程;2003年09期
7 唐皓京;高桩码头施工中围囹工艺的新思路[J];水运工程;2003年11期
8 曹称宇,伍荣官;高桩码头在横向集中水平力作用下齿槽的受力计算[J];中国港湾建设;2004年02期
9 单红仙,秦建敏,贾永刚,刘红军,许国辉,郑建国;青岛港木质高桩码头变形破坏监测与预报[J];岩石力学与工程学报;2004年05期
10 许志文;汕头港珠池港区二期连片式高桩码头施工技术要点[J];港工技术;2004年04期
相关会议论文 前10条
1 黄长虹;韦灼彬;张琦彬;;高桩码头锈蚀监测研究[A];第17届全国结构工程学术会议论文集(第Ⅱ册)[C];2008年
2 王滨;李颖;朱彬彬;郑鹏翔;周永;;平面形状不规则高桩码头的地震扭转效应[A];现代水利水电工程抗震防灾研究与进展(2013年)[C];2013年
3 方t,
本文编号:2416616
本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/2416616.html