当前位置:主页 > 科技论文 > 水利工程论文 >

循环荷载作用下应力速率与应变速率不同步研究

发布时间:2019-02-27 16:34
【摘要】:为深入研究循环加卸载作用下岩体的变形规律,针对三峡库区砂岩进行了56组循环加卸载试验。根据试验的不同步现象,对应力 应变滞后概念进行修正:(1)应力超前于应变和应力滞后于应变现象共存,故将"应力 应变滞后现象"更名为"应力 应变不同步现象"更为合理;(2)在应力 应变不同步现象的基础上,应考虑应力速率 应变速率的不同步现象。通过分析循环加卸载试验的不同步机制,提出应力 应变吸引点、应力速率 应变速率吸引点、应力 应变补偿机制和应力速率 应变速率补偿机制4个概念,并且得到:应力 应变同步与应力速率 应变速率同步不能同时出现;不同步现象是必然而同步仅存在于某一时刻点;应力 应变处于螺旋式循环递进的过程。基于循环加卸载试验,首次发现应力速率 应变速率不同步现象,在不同步现象中提出了3个不同步阶段的定义,并通过分析预测变形速率 实际变形速率、表观弹性模量以及岩样的瞬时泊松比随时间的变化规律,提出3种对不同步阶段定量判别的方法。此外,基于同频率不同峰值强度下试验得到,随着峰值强度f(t)的增加,岩样的E(t)值逐渐增加,式E(t)?af(t)?b吻合度也逐渐增加。
[Abstract]:In order to study the deformation rule of rock mass under cyclic loading and unloading, 56 groups of cyclic loading and unloading tests were carried out for sandstone in the three Gorges Reservoir area. According to the phenomenon of out-of-synchronization, the concept of stress-strain lag is modified: (1) stress is ahead of strain and stress-lag is coexisting with strain; Therefore, it is more reasonable to change the name of "stress-strain lag phenomenon" to "stress-strain out-of-sync phenomenon". (2) the stress rate and strain rate should be taken into account on the basis of stress-strain asynchronous phenomenon. By analyzing the asynchronous mechanism of cyclic loading and unloading test, four concepts are put forward: stress / strain attraction point, stress rate / strain rate attraction point, stress / strain compensation mechanism and stress rate / strain rate compensation mechanism. The results show that the synchronization of stress-strain and stress-rate-strain can not occur at the same time. The phenomenon of out-of-sync is inevitable, and synchronization only exists at a certain point of time, and the stress and strain are in the spiral cycle progressive process. Based on cyclic loading and unloading tests, the phenomenon of stress rate / strain rate dissynchronism is found for the first time. In this paper, the definition of three out-of-sync stages is put forward, and the deformation rate / actual deformation rate is predicted by analyzing and predicting the deformation rate. Based on the variation of apparent elastic modulus and instantaneous Poisson ratio of rock samples with time, three methods for quantificationally discriminating out-of-sync stage are proposed. In addition, based on the same frequency and different peak intensity, it is found that with the increase of peak intensity f (t), the E (t) value of rock samples increases gradually, and the E (t)? af (t)? b coincidence also increases gradually.
【作者单位】: 三峡大学三峡库区地质灾害教育部重点实验室;三峡大学土木与建筑学院;
【基金】:国家科技支撑计划项目(2015BAB07B08) 国家自然科学基金资助项目(51579138) 长江科学院开放研究基金资助项目(CKWV2016377/KY)~~
【分类号】:TV223

【共引文献】

相关期刊论文 前10条

1 王春利;张桂鑫;韩华伟;于晓灵;高新江;;基于化工生产过程历史数据的报警优化方法研究[J];中国安全生产科学技术;2016年11期

2 张华强;李东兴;张国强;;混合χ~2检测法在组合导航系统故障检测中的应用[J];中国惯性技术学报;2016年05期

3 朱苗苗;;基于结构方程模型改进ARMA模型参数估计[J];软件导刊;2016年09期

4 魏博文;熊威;李火坤;彭圣军;徐镇凯;;融合混沌残差的大坝位移蛙跳式组合预报模型[J];武汉大学学报(信息科学版);2016年09期

5 牟宏磊;程咏梅;苟斌;刘建新;李松;;基于证据推理的联合故障检测方法[J];控制与决策;2016年09期

6 邓冠龙;杨洪勇;张淑宁;顾幸生;;零等待flow shop多目标调度的混合差分进化算法[J];山东大学学报(工学版);2016年05期

7 周华;周水银;;基于自主性的专业服务定价策略[J];系统管理学报;2016年03期

8 徐晓滨;李世宝;马雪;王双中;;基于置信规则库的控制器及控制系统仿真[J];杭州电子科技大学学报(自然科学版);2016年03期

9 周君兴;俞列红;王炳兴;;指数和Weibull串联系统环境因子的统计推断[J];高校应用数学学报A辑;2016年01期

10 吴s,

本文编号:2431435


资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/2431435.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户c99b8***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com