双护盾TBM掘进速度的影响因素研究

发布时间:2019-03-16 11:13
【摘要】:以甘肃引洮一期工程9#隧洞为例,综合引入多层线性模型及数量化理论I的建模原理,在初始设置的解释变量基础上,通过逐步删除不显著解释变量的方法,建立了两层线性模型,对双护盾TBM的掘进速度的影响因素进行了研究。通过计算模型各解释变量固定效应的参数估计值,定量阐述了各因素对掘进速度的直接和间接影响,并依据模型的参数估计值结果对未来TBM的更好施工提出建议。通过预测模型和实例应用两方面分析、证明了该模型应用的可靠性,为同类工程掘进速度的合理预测和施工进度有效控制提供了理论依据。
[Abstract]:Taking the No. 9 tunnel of Yintao Phase I Project in Gansu Province as an example, the modeling principle of multi-layer linear model and quantitative theory I is introduced. On the basis of the initial set-up of the explanatory variables, the method of gradually deleting the inconspicuous explanatory variables is carried out. In this paper, a two-layer linear model is established to study the influencing factors of tunneling speed of TBM with double shields. By calculating the parameter estimation values of the fixed effect of each explanatory variable in the model, the direct and indirect effects of each factor on the tunneling speed are described quantitatively. According to the results of the model's parameter estimation, suggestions for better construction of TBM in the future are put forward. The reliability of the model is proved through the analysis of prediction model and practical application, which provides a theoretical basis for reasonable prediction of excavation speed and effective control of construction schedule for similar projects.
【作者单位】: 甘肃农业大学工学院;中国水利水电第四工程局;
【基金】:国家批复引洮工程科学研究试验基金(YT374-ZX33-09107)
【分类号】:TV554

【相似文献】

相关期刊论文 前5条

1 王洁;TBM在不同特性硬岩中的掘进速度[J];隧道建设;2002年03期

2 袁兴泽;李文富;赵玉辉;;TBM掘进速度及影响因素浅析[J];水利建设与管理;2009年04期

3 吴水锋;吴水平;;如何提高煤矿巷道光面爆破掘进速度[J];科学之友;2013年01期

4 李良忠;;浅析槽子“炸死”的危害和解决办法[J];爆破器材;1983年04期

5 ;[J];;年期

相关会议论文 前1条

1 李潮;丁靖洋;郑长江;周宏伟;;塌方区域对TBM掘进速度的影响[A];北京力学会第18届学术年会论文集[C];2012年



本文编号:2441219

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/2441219.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户fa51b***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com