当前位置:主页 > 科技论文 > 水利工程论文 >

集鱼船在水电工程应用的问题与建议

发布时间:2019-03-22 11:07
【摘要】:集运鱼系统为过鱼设施的一种,应用于高坝大库工程,正日益得到关注。过鱼设施的关键在于集鱼,而集运鱼系统一般利用集鱼船进行集鱼。目前,集鱼船在水电工程应用中存在成年鱼类集鱼难度大、诱集底栖鱼类效果较差和急流水域集鱼作业困难等问题。对此进行了探讨,提出了加强鱼类活动调查、深入鱼类习性研究、优化集鱼船体结构和构建适宜集鱼区域等建议,以期为水电工程集鱼船的应用提供参考。
[Abstract]:The fish-collecting system is a kind of over-fish facility, and it is becoming more and more concerned with the high-dam large-bank project. The key to the fish-passing facility lies in the collection of fish, and the fish-collecting system generally uses a fish-collecting vessel for the collection of fish. At present, the fish-collecting vessel has the problems of large fish-collecting difficulty in the application of the hydropower project, poor effect of the trapping and benthic fish, and difficulty in the operation of the fish in the current water area. In this paper, some suggestions are put forward to strengthen the investigation of the fish activity, to study the characteristics of the fish, to optimize the structure of the fish hull and to construct a suitable fish-collecting area, in order to provide a reference for the application of the fish ship for the hydropower project.
【作者单位】: 中国电建集团华东勘测设计研究院有限公司;宁波原水集团集团公司;
【分类号】:S956;TV697.4

【相似文献】

相关期刊论文 前10条

1 蒋成环;;基于GIS的水电工程数字化管理研究[J];科技创新导报;2008年32期

2 万林伟;;水利水电工程中的安全生产及其管理[J];河南水利与南水北调;2008年06期

3 张俊芝;马来西亚水电工程考察与体会[J];江西水利科技;1997年03期

4 涂志平;;浅谈水利水电工程施工特点及安全施工管理[J];江西建材;2014年10期

5 罗卫平;;如何保证中小型水电工程发电目标[J];科技创新导报;2008年30期

6 黎永群;;论我国水电工程项目管理模式的改革[J];现代经济信息;2009年12期

7 侯骥;;建筑项目水电工程管理分析[J];黑龙江水利科技;2013年11期

8 熊峻峰;;水电在缅甸能源开发中的领先作用[J];水利水电快报;2006年07期

9 李明;;建设单位在水利水电工程建设管理中的重要作用[J];广东科技;2013年14期

10 郑霞忠;胡斌锋;郑p,

本文编号:2445535


资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/2445535.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户d2b97***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com