南辛安河综合治理工程项目进度管理研究
[Abstract]:The river engineering management is an important environmental problem. The Nanxin River comprehensive management project is an example of the contemporary suburban river transformation. In order to create a good urban living environment and meet the spiritual needs of the people, the progress management of river transformation should be carried out from the aspects of original water quality improvement and river bank greening, road, river bottom widening and so on, to create a good urban living environment and to meet the spiritual needs of the people. Therefore, the research on the progress of the comprehensive management project of Nanxin'an River has a great reference for the transformation of other rivers in the suburbs, and also has a certain guiding role for the transformation of other similar rivers, and the way of schedule control has been applied to other projects. Improve the management level of the project, at the same time to the relevant theoretical research is also a supplement. The paper mainly includes the following five aspects. The first part is the introduction, including the background and significance of the research, the research status at home and abroad, as well as the methods and research contents of this paper. The second part is the theoretical basis of the progress management of river management project, the method of schedule management and control, Gantt chart, critical circuit method, plan evaluation technique, and the application of double code and single code. There are also the characteristics of river management projects. The third part is the formulation of the schedule plan of the Nanxin River Management Project, including the outline of the South Xin'an River Management Project, the organization and management of the South Xin'an River Management Project, and the analysis of the factors affecting the progress of the South Xin'an River Management Project. The task decomposition of the Nanxinan river management project and the establishment of the schedule plan of the Nanxinan river management project. The fourth part is the progress control of the Nanxin River harnessing project, including the overall progress control, the bank protection project progress control, the river structure project progress control. Progress control of sewage interception and reclaimed water works as well as control of landscape and commercial development projects. The fifth part is conclusions and recommendations.
【学位授予单位】:中国海洋大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:TV85;TV511
【参考文献】
相关期刊论文 前10条
1 谢晓峰;;水利工程进度控制研究[J];水利科技与经济;2013年03期
2 宋歌;;辽河保护区治理与保护能力建设研究[J];环境科学导刊;2012年05期
3 金雪莲;任婧;夏峰;;我国河流湖泊砷污染研究进展[J];环境科学导刊;2012年05期
4 龚蕾婷;蔡颖;刘华;於梦秋;冷欣;安树青;;生态治理工程对太湖入湖河道水环境改善效果的研究[J];安徽农业科学;2012年28期
5 田进;;阳城县西小河防洪治理与水环境改善方案[J];山西建筑;2012年28期
6 王惠萍;周志华;;从清河治理看现代治水思想的进步[J];中国水利;2012年17期
7 管宏飞;肖诗荣;明成涛;;宜昌城区长江岸坡稳定性预测评价[J];三峡大学学报(自然科学版);2012年04期
8 聂隽;陈红枫;;区划调整后巢湖水污染治理的机遇与挑战——基于排污权交易的巢湖水质管理研究[J];中国环境管理;2012年04期
9 上官丽霞;;芦苇河下游段河道治理措施[J];山西水利科技;2012年03期
10 李红艳;;关于加强中小河流治理提升防洪能力对策分析[J];科技创新与应用;2012年21期
相关博士学位论文 前1条
1 胡程顺;水电工程施工进度优化及控制方法研究[D];天津大学;2005年
相关硕士学位论文 前10条
1 高楠;进度管理在某研究所某厂房冷却循环水系统改造工程中的应用[D];吉林大学;2012年
2 方勇峰;西江盾构项目施工进度管理研究[D];兰州大学;2012年
3 张国东;枫林水利枢纽工程项目进度管理研究[D];吉林大学;2011年
4 宋海涛;滹沱河防洪修复工程项目的进度管理研究[D];中国海洋大学;2011年
5 刘东;M公司工程建设项目进度计划与控制[D];南京理工大学;2011年
6 耿晓哲;高新区浞河治理项目进度计划与控制研究[D];中国海洋大学;2009年
7 赵倩;基于流域功能区划的河流综合治理研究[D];大连理工大学;2009年
8 胡文琦;重庆市主城区次级河流景观综合整治策略研究[D];重庆大学;2009年
9 靳羽东;长沙城区河流景观生态安全问题与理性化设计[D];湖南农业大学;2008年
10 伍隽杉;湖南江河公司YBK-2000项目进度管理研究[D];湖南大学;2008年
,本文编号:2456660
本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/2456660.html