海外太平江水电站BOT项目风险管理研究
发布时间:2019-04-12 16:48
【摘要】:水力发电作为一种清洁的可再生能源和新能源,目前已成为中国新能源战略重点,BOT项目融资始于20世纪70年代,其主要作用体现在为保障项目产出,用较低额度的项目投资来获得大额度的项目贷款,BOT项目融资被称为“风险库”,风险和机遇,经长时间研究证明,风险识别和防范是BOT项目融资成功的关键。论文全面分析了BOT融资方式的基本理论、起源与发展、融资方式与过程以及BOT融资的优势与特点,此外,针对BOT融资项目的风险管理与控制的国内外发展、研究现状进行总结,并介绍了课题研究的理论与实践意义。分析水电站风险的来源,风险的识别、风险特征、风险的影响因素和风险防范措施。境外项目的投资风险比国内高出较多,所以施工前期必须做好可行性分析,让风险降为最低。作者结合所在太平江水电站为分析案例进行研究,理论结合实际,BOT项目风险管理为该项目发展提供了指导,也为境外公共基础设施建设以及石油、煤炭、新能源等资源开采项目给予借鉴。
[Abstract]:As a clean renewable energy and new energy, hydropower has become the strategic focus of China's new energy, and the financing of BOT project began in the 1970s, its main role is to guarantee the output of the project, and to use low-level project investment to obtain the large-line project loan. The financing of BOT project is called "Risk bank", risk and opportunity. It is proved by long-term study that risk identification and prevention are the key to the success of BOT project financing. The paper comprehensively analyzes the basic theory, origin and development of the BOT financing method, the financing way and the process and the advantages and characteristics of the BOT financing. In addition, the present situation of the research and development of the risk management and control of the BOT financing project is summarized. The theoretical and practical significance of the subject research is also introduced. Analyze the source, risk identification, risk characteristics and risk factors and risk prevention measures of the risk of the hydropower station. The investment risk of overseas projects is much higher than that in the country, so the feasibility analysis must be made in the early stage of construction, and the risk is reduced to the lowest. The author studies the case of the Taipingjiang hydropower station, and combines the theory with the practice, and the BOT project risk management provides guidance for the development of the project, and also provides reference for the construction of the overseas public infrastructure and the exploitation of the resources such as oil, coal, new energy and the like.
【学位授予单位】:云南大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TV737;F426.61
本文编号:2457197
[Abstract]:As a clean renewable energy and new energy, hydropower has become the strategic focus of China's new energy, and the financing of BOT project began in the 1970s, its main role is to guarantee the output of the project, and to use low-level project investment to obtain the large-line project loan. The financing of BOT project is called "Risk bank", risk and opportunity. It is proved by long-term study that risk identification and prevention are the key to the success of BOT project financing. The paper comprehensively analyzes the basic theory, origin and development of the BOT financing method, the financing way and the process and the advantages and characteristics of the BOT financing. In addition, the present situation of the research and development of the risk management and control of the BOT financing project is summarized. The theoretical and practical significance of the subject research is also introduced. Analyze the source, risk identification, risk characteristics and risk factors and risk prevention measures of the risk of the hydropower station. The investment risk of overseas projects is much higher than that in the country, so the feasibility analysis must be made in the early stage of construction, and the risk is reduced to the lowest. The author studies the case of the Taipingjiang hydropower station, and combines the theory with the practice, and the BOT project risk management provides guidance for the development of the project, and also provides reference for the construction of the overseas public infrastructure and the exploitation of the resources such as oil, coal, new energy and the like.
【学位授予单位】:云南大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TV737;F426.61