路俄水库土石坝渗流与稳定分析
[Abstract]:Luo Reservoir Project is located in Luchun County, Honghe Prefecture, Yunnan Province. It is located on the Haka River, a tributary of Niukong River in the west of Luchun County, and belongs to the Red River system. The Luo Reservoir Project is a water conservancy project with the task of water supply and agricultural irrigation for urban, rural people and livestock, and the scale of the project is medium-sized. In this paper, the gravel core wall rockfill dam of reservoir engineering is designed. The key to the design of earth-rock dam lies in whether the slope stability can be satisfied under the action of seepage. The main results are as follows: (1) according to the hydrogeological data, the dam type selection, engineering layout and so on are determined. The dam size data such as dam top elevation are determined by calculation. (2) according to hydrological data, Xingli regulation calculation and flood regulation calculation are carried out to determine reservoir dead water level, normal water level, design flood water level, check flood water level and reservoir engineering scale. (3) according to the determined dam body size, CAD drawing is carried out, which is introduced into correction software to start modeling and input corresponding calculation parameters to complete modeling. The corresponding calculation parameters are determined according to the engineering geological report. The calculation results of the correction software show that both the dam seepage stability and the dam slope anti-slide stability meet the requirements of the code. (4) the Geo-studio software is introduced and modeled in the Seep/w module and Slope/w module of the Geo-studio software, and the calculation parameters are the same as those of the correction software. The single width seepage rate, downstream escape ratio drop, anti-skid stability safety factor and so on are calculated. (5) although the anti-skid stability safety factor calculated by the two software is different, it can be used for dam safety evaluation within a reasonable range. Combined with the minimum safety factor of anti-slide stability of dam slope given by the code, it is concluded that the design of earth-rock dam in this paper fully satisfies the seepage stability and dam slope stability.
【学位授予单位】:西北农林科技大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TV641;TV223.4
【相似文献】
相关期刊论文 前10条
1 刘则邹;;土石坝施工天气状态随机模拟方法探讨[J];湖北水力发电;1989年01期
2 靳忠才;冬季碾压土石坝的施工探讨[J];山西水利;2003年04期
3 蒋莉;刘宪亮;;土石坝优化设计研究[J];黄河水利职业技术学院学报;2006年04期
4 马涛;史春全;李福金;;土石坝设计中接合部位的处理[J];黑龙江水利科技;2007年04期
5 王峰;;土石坝的施工现场管理[J];科技信息(科学教研);2007年29期
6 贾文生;;土石坝施工中对接合部位的处理措施[J];甘肃水利水电技术;2007年04期
7 包锋勇;;浅析水利工程土石坝施工技术[J];科技资讯;2009年22期
8 王瑞雪;唐德善;刘子增;;土石坝成本风险评价[J];水电能源科学;2009年06期
9 祁琳浩;;水利水电工程土石坝施工[J];中国新技术新产品;2010年16期
10 郭建梅;;土石坝施工工艺控制要点[J];黑龙江水利科技;2010年03期
相关会议论文 前4条
1 曹国利;李治明;;土石坝沉降计算的几个问题[A];土石坝与岩土力学技术研讨会论文集[C];2001年
2 杨明凤;;土石坝坝体填筑浅析[A];土木建筑学术文库(第12卷)[C];2009年
3 来妙法;郎小燕;;土石坝深厚及软弱覆盖层坝基的处理[A];土石坝技术——2008年论文集[C];2008年
4 李岳兵;;帷幕灌浆技术在土石坝除险加固中的应用[A];2014年5月建筑科技与管理学术交流会论文集[C];2014年
相关硕士学位论文 前6条
1 张开来;土石坝固结中的应力调整[D];山东大学;2016年
2 陈启振;土石坝抗震稳定性分析及震后坝坡安全性研究[D];天津大学;2014年
3 方炫强;土石坝施工加载仿真可视化研究与应用[D];大连理工大学;2006年
4 刘新根;土石坝施工质量监控的离散单元法分析[D];郑州大学;2007年
5 齐晓华;基于有限元法的土石坝渗流及稳定分析研究[D];内蒙古农业大学;2012年
6 陈小勇;基于FBG传感网的土石坝在线监测系统研究[D];昆明理工大学;2013年
,本文编号:2506480
本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/2506480.html