某引水隧洞开挖钻爆法施工爆破参数的优化
发布时间:2019-07-25 05:50
【摘要】:引水隧洞开挖过程中,如何控制好超欠挖是一项重点与难点工作。针对某引水隧洞钻爆法施工部分洞段Ⅲ类围岩爆破开挖平均超挖超过20 cm的情况,通过调整爆破周边孔间距、不耦合系数以及中心孔楔形掏槽级别等方式,对爆破参数进行调整修正。爆破参数调整后,实测平均超挖由23.7 cm降至10.6 cm,得出适合该段工程开挖的最优爆破参数,使得爆破施工更为规范有序,在保证开挖质量的同时,减少了混凝土回填量、降低了后期衬砌混凝土施工成本,同时减小了超挖带来的衬砌混凝土加厚不易振捣等诸多问题的控制难度。
[Abstract]:In the process of diversion tunnel excavation, how to control the super underexcavation is a key and difficult work. In view of the fact that the blasting excavation of class III surrounding rock in the drilling and blasting method of a diversion tunnel is more than 20 cm, the blasting parameters are adjusted and modified by adjusting the blasting peripheral hole spacing, uncoupling coefficient and the cuneiform cutting grade of the central hole. After adjusting the blasting parameters, the measured average overdigging is reduced from 23.7 cm to 10.6 cm, and the optimal blasting parameters suitable for the excavation of this project are obtained, which makes the blasting construction more standardized and orderly. While ensuring the excavation quality, it reduces the amount of concrete backfill, reduces the construction cost of lining concrete in the later stage, and at the same time reduces the difficulty of controlling many problems, such as the thickening of lining concrete caused by overexcavation.
【作者单位】: 辽宁省水利厅;
【基金】:辽宁省重点工程资助项目
【分类号】:TV554.1
本文编号:2518884
[Abstract]:In the process of diversion tunnel excavation, how to control the super underexcavation is a key and difficult work. In view of the fact that the blasting excavation of class III surrounding rock in the drilling and blasting method of a diversion tunnel is more than 20 cm, the blasting parameters are adjusted and modified by adjusting the blasting peripheral hole spacing, uncoupling coefficient and the cuneiform cutting grade of the central hole. After adjusting the blasting parameters, the measured average overdigging is reduced from 23.7 cm to 10.6 cm, and the optimal blasting parameters suitable for the excavation of this project are obtained, which makes the blasting construction more standardized and orderly. While ensuring the excavation quality, it reduces the amount of concrete backfill, reduces the construction cost of lining concrete in the later stage, and at the same time reduces the difficulty of controlling many problems, such as the thickening of lining concrete caused by overexcavation.
【作者单位】: 辽宁省水利厅;
【基金】:辽宁省重点工程资助项目
【分类号】:TV554.1
【相似文献】
相关期刊论文 前10条
1 张成刚;;长大隧道钻爆法施工中通风防尘方案[J];铁道建筑;2009年05期
2 张民仙;王瑜;张恺;;引红济石工程Ⅵ标施工方案研究[J];陕西水利;2012年03期
3 樊治国;;浅谈引红济石调水工程人工钻爆法施工主要工序的质量控制[J];甘肃科技;2014年02期
4 孙金霄;;某电站发电洞钻爆法与TBM施工方案比较[J];水利科技与经济;2013年08期
5 周式以;;废气净化与强力通风——水电站大型隧洞无轨钻爆法施工中的环境保护问题[J];云南水力发电;1990年03期
6 班树春;陈亚红;尤潇华;;钻爆法施工的长大隧道通风防尘方案[J];水利建设与管理;2007年10期
7 全金斌;;水工隧洞工程钻爆法施工超欠挖控制技术[J];大众科技;2008年09期
8 宗琦,杨吕俊;立井冻土钻爆法施工爆破参数初探[J];工程爆破;1999年02期
9 刘丽萍,谢冰,金中彦;钻爆法与全断面掘进机修建地下隧洞的比较[J];山西水利科技;2000年04期
10 刘彦卫;;水工隧洞钻爆法施工中的通风散烟[J];山西水利科技;2013年02期
相关会议论文 前1条
1 何德平;;水工圆隧洞钻爆法施工的研讨[A];中国土木工程学会隧道及地下工程学会第九届年会论文集[C];1996年