HT65A基站天线项目进度管理研究
发布时间:2018-03-02 04:31
本文关键词: 项目管理 HT65A基站天线 项目范围管理 进度管理 出处:《南京理工大学》2014年硕士论文 论文类型:学位论文
【摘要】:随着市场竞争趋势日趋严峻,新产品研发逐渐成为企业长足发展的驱动器。而通信行业竞争更加激烈,市场要求企业快速推出,成本低,质量高,满足客户要求的新产品,基于此,新产品研发管理越来越受到企业的重视,然而目前在新产品研发管理上的研究并不多,在企业实际运行的研发管理流程中还存在着很多有待完善的地方。本文对HT65A基站天线项目的进度管理进行深入的研究,首先对HT65A基站天线这一具体项目进行项目范围规划,范围定义,工作分解结构,范围确认和范围控制,组建了专门的HT65A基站天线项目组,并制定了一套规范的范围控制流程。然后根据项目的工作分解结构,对HT65A项目列出了活动清单和逻辑关系,运用网络技术估算了HT65A基站天线项目的活动持续时间和资源需求情况,用关键路径法算出了项目的总工期,并制定出了HT65A基站天线项目的进度计划,然后运用工期压缩的技术和方法,对进度计划进行了优化从而满足了客户的工期要求,在项目的进度控制中,通过对比法时时监控项目进度,及时做出调整,成功地保证了该项目的顺利实施。
[Abstract]:With the increasingly severe market competition trend, new product research and development has gradually become the driving force for the rapid development of enterprises, while the competition in the communications industry has become more intense, and the market requires enterprises to quickly launch, low cost, high quality, and meet the requirements of new products. Based on this, R & D management of new products is paid more and more attention by enterprises. However, there are few researches on R & D management of new products at present. There are still many places to be improved in the R & D management process of the actual operation of the enterprise. This paper makes a deep research on the progress management of the HT65A base station antenna project. First, the project scope of the HT65A base station antenna project is planned. Scope definition, work breakdown structure, scope confirmation and scope control, set up a special HT65A base station antenna project team, and developed a set of standard scope control flow. Then according to the work breakdown structure of the project, The activity list and logic relation of HT65A project are listed, the duration of activity and resource requirement of HT65A base station antenna project are estimated by using network technology, and the total duration of project is calculated by critical path method. The progress plan of the HT65A base station antenna project is worked out, and then the schedule is optimized by using the technology and method of time compression to meet the requirements of the customer, and in the progress control of the project, Through the contrast method to monitor the progress of the project and make timely adjustments, the successful implementation of the project is ensured.
【学位授予单位】:南京理工大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:TN929.5
,
本文编号:1555042
本文链接:https://www.wllwen.com/kejilunwen/wltx/1555042.html