SOP的风电设备检修工艺的应运
本文选题:SOP + 新增装机容量 ; 参考:《企业管理》2016年S2期
【摘要】:正2015年,中国风电装机容量再创新高,全国(除台湾地区外)新增安装发电机组16740台,新增装机容量30753兆瓦,同比增长32.6%;累计装机92981台,累计装机容量145362兆瓦,同比增长26.8%。以风电设备机组检修规范为依据,风电机组分为半年检、全年检,合计每年需完成185962台次检修.风电设备检修是设备安全、经济运行的基础。因此,制定科学
[Abstract]:In 2015, the installed capacity of wind power in China reached a new high, with 16740 new generating units installed nationwide (except in the Taiwan region) and 30753 megawatts of installed capacity, an increase of 32.6 percent over the same period last year, and a cumulative installed capacity of 92981 units with a cumulative installed capacity of 145362 megawatts, an increase of 26.8 percent over the same period last year. Based on the maintenance specification of wind power equipment units, wind turbine units are divided into half annual inspection and full annual inspection. Maintenance of wind power equipment is the basis of safe and economical operation of equipment. Therefore, the development of science
【作者单位】: 华电国际宁夏新能源发电有限公司;
【分类号】:F426.61;TM614
【相似文献】
相关期刊论文 前4条
1 朱昊;林国龙;;基于SOP的航运企业管理模式[J];水运管理;2007年10期
2 肖飒;王梅;;29道品评“关口” 56个“SOP”规范——青啤西安公司从细节抓品牌[J];世界标准信息;2005年08期
3 贾明;刘燕子;张建波;;岭澳二期核电厂SOP程序验证[J];核科学与工程;2010年S1期
4 ;[J];;年期
相关会议论文 前5条
1 胡松浩;张健;;SOP在静脉药物配置中心的推行和探讨[A];规范静脉输液混合调配学术研讨会论文集[C];2006年
2 黄娅;易思荣;;中药材GAP基地建设和SOP操作规程制订指标[A];第六届全国药用植物和植物药学术研讨会论文集[C];2006年
3 赵奋国;;影像技术SOP管理[A];2009中华医学会影像技术分会第十七次全国学术大会论文集[C];2009年
4 钟仕强;冯世鑫;;罗汉果SOP制定的前期工作研究[A];全国第5届天然药物资源学术研讨会论文集[C];2002年
5 王书林;;从中药材GAP研究看中药现代化进程[A];全国中药材GAP研究与应用学术研讨会会议论文汇编[C];2004年
相关重要报纸文章 前3条
1 罗穗;药品监管也要制定SOP[N];中国医药报;2003年
2 本报记者 姜蓉;教育领域的SOP实践[N];中国经营报;2009年
3 青岛啤酒(日照)有限公司/柳海波;流程图在SOP中的作用[N];华夏酒报;2010年
相关硕士学位论文 前2条
1 赵磊;川牛膝与黄连轮作规范化种植规程(SOP)和川牛膝多糖提取分离技术研究[D];成都中医药大学;2009年
2 任凯;SOP在哈威物流公司的应用研究[D];华中科技大学;2010年
,本文编号:2052325
本文链接:https://www.wllwen.com/qiyeguanlilunwen/2052325.html