大型建设项目EPC合同争端预警管理体系研究
[Abstract]:EPC general contracting is the most representative of all general contracting modes, and it is one of the most frequently used general contracting contracts, especially in international engineering contracting. Since the issuance of the document No. 30 of the former Ministry of Construction in 2003, the EPC general contract has been adopted by the domestic contracting parties more and more. EPC general contracting means that the general contracting enterprises undertake the design, procurement, construction, trial operation and other services of the project in accordance with the contract. And the quality of the contract project, safety, duration, cost of the overall responsibility. But in practice, managers have to deal with many potential problems, especially EPC contract disputes. Firstly, the characteristics and classification of EPC contracts, the causes of disputes, the characteristics and classification of disputes, the basic information analysis of EPC contracts and the current situation of dispute warning are analyzed. The results show that EPC contracts are prone to disputes. Secondly, the paper studies the composition of the dispute settlement cost and the result of the dispute in the EPC contract. It shows that once the dispute arises in the EPC contract, it will bring serious consequences to both parties and the cost will be extremely serious. Thirdly, in order to prevent, warn and follow up disputes, according to the information of some symptoms, the causes of disputes and the characteristics of EPC contracts, the reasoning theory and rough set theory are used synthetically. Entropy weight method and Euclidean distance Retrieval (Euclidean distance Retrieval) method are used to construct a (CCBR RBR) model which integrates qualitative and quantitative case-based reasoning and rule-based reasoning to prevent and warn possible disputes and to track them in real time. Furthermore, on the basis of CBR RBR model, adding enumeration method is used to analyze the key factors that may lead to disputes in EPC contracts, and to forewarn the disputes of EPC contracts by controlling key factors in real time. Finally, the paper verifies the realization of EPC contract dispute early warning by case analysis. Based on the above method, a dispute early warning group composed of owner, general contract and DAB dispute adjudication committee is set up and a matrix division of personnel duties is designed. The group has the function of "tripartite linkage" and can achieve the management effect of "3-14".
【学位授予单位】:西安建筑科技大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:F426.92
【参考文献】
相关期刊论文 前10条
1 张水波;汪辉辉;何伯森;;EPC总承包工程项目的争端与索赔[J];国际经济合作;2006年02期
2 路铁军;王岳森;任晓帅;;国际工程ADR与新型争端解决机制之构建[J];国际经济合作;2008年11期
3 黄李冲;于忠海;陈田;;基于RBR-CBR的数控刀具材料选择专家系统[J];中国制造业信息化;2011年21期
4 陈靖;;EPC工程总承包项目管理模式及其风险[J];水利水电工程造价;2007年04期
5 孙瑞英;;基于投射理论的隐性信息需求挖掘研究——以图书馆咨询解答工作为例[J];图书馆论坛;2011年06期
6 李闫岩;索鑫;;基于交易成本的建设工程争议评审制度完善[J];商场现代化;2012年28期
7 Per Christiansson;Kistian Birch Sφrensen;Mette Rφdtness;Mette Abrahamsen;Lars Ostenfeld Riemnann;Morten Alsdorf;;User Driven Innovation in the Building Process[J];Tsinghua Science and Technology;2008年S1期
8 胡春萍;马立红;;构建卓越的“EPC项目管理体系”——中国石油工程设计有限公司EPC项目管理体系实践[J];项目管理技术;2009年06期
9 余芳,姜云飞;一种基于朴素贝叶斯分类的特征选择方法[J];中山大学学报(自然科学版);2004年05期
10 李成;;国际工程承包合同风险管理体系改进[J];中国水运(下半月);2011年09期
相关硕士学位论文 前4条
1 姜华;大型EPC总承包项目的业主需求识别研究[D];天津大学;2006年
2 付振江;EPC合同争端预警及争端解决研究[D];天津大学;2007年
3 史军;基于粗糙集理论的属性约简算法研究[D];青岛大学;2009年
4 王向飞;工程争端预防及争端处理满意度研究[D];天津大学;2009年
,本文编号:2279254
本文链接:https://www.wllwen.com/qiyeguanlilunwen/2279254.html