当前位置:主页 > 社科论文 > 生态环境论文 >

污水处理设备制造新厂区建设项目研究

发布时间:2018-09-05 12:16
【摘要】:21世纪经济的快速发展极大地改善了人们的生活条件,提高了人们的生活水平,但同时也带来了资源的巨大浪费和生态环境的急剧破坏,目前,我国大约有90%的城市水域受到严重污染,大约有70%的城市河流已经不能作为饮用水源,大约有80%的污水未处理就直接进行排放,再加上我国的水资源本身就具有总量少,人口多,人均少,水资源地区分配不均,水土资源不匹配的特点,污水处理成为当前经济发展的重要任务之一,国家对污水处理设备的需求急剧增加,国家采取了一系列政策、措施鼓励企业大力发展污水处理技术,生产高科技含量、高效率的污水处理设备,在这种形势下,潍坊经纬环境技术设备有限公司积极响应国家的号召,抓住发展的良机,结合公司以及本地的实际情况,决定新建污水处理设备制造新厂区。本文结合潍坊本地的实际情况,运用项目管理相关的的理论和方法,对潍坊经纬环境技术设备有限公司新上的污水处理设备制造新厂区项目建设进行了研究,通过实际勘察、数据合理性分析等方法研究经纬污水处理设备制造新厂项目建设过程中项目管理的应用情况,分析了项目建设过程中在组织结构、成本控制、进度控制、质量控制和风险管理等方面等存在的问题和不足,提出了具体的改进方案和措施,总结了项目实施过程中的经验教训,为其他污水处理设备制造厂区的建设提供参考,避免后续项目走弯路,以合理配置人力、物力资源、节约时间,使企业能够又快又有质量的完成新厂区的建设,以保证污水处理设备能够尽早投入生产,为我国污水处理设备的发展以及环境保护尽一份力量。
[Abstract]:The rapid development of economy in the 21st century has greatly improved the living conditions and living standards of people, but at the same time, it has also brought huge waste of resources and sharp destruction of ecological environment. About 90% of the urban waters in China are seriously polluted, about 70% of urban rivers are no longer available as drinking water sources, and about 80% of the sewage is discharged directly without treatment. In addition, the total amount of water resources in our country is low. The characteristics of large population, low per capita population, uneven distribution of water resources and mismatch of water and soil resources, sewage treatment has become one of the important tasks of current economic development, the demand for sewage treatment equipment has increased sharply, and the state has adopted a series of policies. In this situation, Weifang Jingwei Environmental Technology equipment Co., Ltd. actively responds to the call of the state and seize the opportunity of development. Combined with the actual situation of the company and local, decided to build new sewage treatment equipment manufacturing new plant. Based on the local situation of Weifang and the relevant theories and methods of project management, this paper studies the construction of the new sewage treatment equipment manufacturing project in Weifang Jingwei Environmental Technology equipment Co., Ltd. This paper studies the application of project management in the construction process of the new plant of warp and weft sewage treatment equipment, and analyzes the organization structure, cost control and schedule control in the process of project construction. The problems and shortcomings in quality control and risk management are put forward, and the concrete improvement schemes and measures are put forward, and the experiences and lessons in the implementation of the project are summarized, which can provide a reference for the construction of other sewage treatment equipment manufacturing plant areas. Avoid the detours of subsequent projects, rationally allocate manpower and material resources, save time, enable enterprises to complete the construction of new plant areas quickly and qualitatively, so as to ensure that sewage treatment equipment can be put into production as soon as possible, For the development of sewage treatment equipment and environmental protection.
【学位授予单位】:青岛大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:X703

【参考文献】

相关期刊论文 前10条

1 肖辉;;PDCA循环在工程总承包项目安全管理中的应用[J];建筑安全;2015年04期

2 赵贺奇;;浅析工程项目质量、进度、成本的综合控制[J];民营科技;2011年09期

3 张建勋;;基于项目管理的工程质量管理方法浅析[J];黑龙江交通科技;2011年07期

4 付志超;;浅谈建筑工程建设中成本与质量及进度的关系[J];现代商业;2011年09期

5 李恒彬;;建筑工程项目全面质量管理方法探究[J];福建建材;2011年01期

6 潘伟瑜;;工程项目质量控制存在的问题及对策[J];中国新技术新产品;2010年08期

7 李芳;;工程项目建设过程中的质量控制方法初探[J];中小企业管理与科技(下旬刊);2010年03期

8 宋振;;工程进度管理的意义与方法[J];中小企业管理与科技(上旬刊);2010年03期

9 李世芬;;工程投资管理浅析[J];科技信息;2009年15期

10 任伟民,赵禹骅;项目组织结构的设计问题研究[J];东方电气评论;2002年03期



本文编号:2224240

资料下载
论文发表

本文链接:https://www.wllwen.com/shengtaihuanjingbaohulunwen/2224240.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户fce95***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com